Laserfiche WebLink
covering not more than three (3) wall outlets. <br />(9) There is hereby established a minimum electrical <br />permit fee of $10.00, provided, however that there <br />shall be no fee for a permit covering not more than <br />three (3) wall outlets. <br />(10) Dryers: <br />Old residences 2.00 <br />New residences 1.00 <br />(11) Air conditioning units 2.00 <br />Mr. Hargis seconded the motion which carried 4 ayes, 0 nays. <br />License Fees were discussed next and Mr. Hargis made a motion to <br />increase initial fee for Contractor's License to $150.00 with annual <br />renewal fee of $50.00 and to require the $1,000. Bond required to <br />expire on same date as License, June 30, of each year and require that <br />Contractors have a current Bond in order to hold a Contractor's <br />License. Mr. Crane seconded the motion which carried 4 ayes, 0 nays. <br />Mr. Crane made a motion that City send Sign Contractors and Heating and <br />Air Conditioning Contractors a letter informing them of the <br />consequences of wiring in the City without license or permit. Mr. <br />Stripland seconded the motion which carried 4 ayes, 0 nays. <br />Mr. Crane then made a motion to adjourn meeting, seconded by Mr. <br />Stripland which carried 4 ayes, 0 nays. <br />The next meeting was set for April or sooner if needed to meet with <br />Dallas Electrical Board Members. <br />It was noted that Dale Maberry and Bob Crawford had failed their recent <br />test for Contractor's License. <br />Bryan Hargis <br />Secretary <br />E <br />