Laserfiche WebLink
FREESE AND <br />NICHOLS: <br />HELPING YOU <br />PROTECT YOUR <br />WATER SUPPLY <br />Innovative approaches . . <br />`r Moog <br />ir..se ow eionoas <br />practical results <br />582 <br />Advisory Systems Threat Conditions, but also specific incident response plans. The <br />plan will be used as a stand -alone document for water department training and <br />"meshes" with the water system's citywide ERP. <br />Vulnerability Assessment Assistance <br />Brazos River Authority <br />FNI assisted the Brazos River Authority (BRA) in preparing primary <br />components of the water system VA utilizing a workshop format and <br />field site characterization data. Utilizing the RAM -W methodology, <br />FNI assisted the BRA in determining the risk to each facility by <br />evaluating the system's effectiveness against each adversary. The <br />workshop also included a session presenting available security <br />system technologies. . <br />PREVIOUS EXPERIENCE <br />The following projects represent reliability assessments FNI was asked to perform <br />in advance of the Bioterriorism Act: <br />Water Treatment Plant Facility Plan- Reliability Assessment <br />City of Fort Worth <br />FNI evaluated the reliability of the Rolling Hills Water Treatment T�jO TH <br />Plant as well as the overall distribution system and FO R ►1 <br />recommended improvements. The assessment identified �= <br />vulnerable system components. Failures of system components <br />were analyzed for the impact on the City's ability to deliver and distribute treated <br />water throughout the system. The capacity and reliability of the raw water system <br />based on projected and recommended raw water system improvements was <br />evaluated. Improvements to increase reliability were prioritized for the City's <br />capital improvement program. (Personal experience of Project Manager Tina <br />Hanson, P.E.) <br />East Side Water Treatment Plant- Vulnerability Assessment <br />City of Dallas <br />The assessment identified vulnerable system components. Failures of DD41 <br />system components were analyzed for the impact on the City's ability to <br />deliver treated water to the system. Improvements to increase reliability <br />were prioritized for inclusion in the City's capital improvement program. <br />(Personal experience of Project Manager, Tina Hanson, P.E.) <br />Vulnerability Assessment and Security Inspections AEP <br />Power Plant Dams 59 PLAL,-- <br />Sabine River Authority, Texas „ <br />FNI was hired by the Sabine River Authority to conduct <br />security inspections at Lake Fork and Iron Bridge Dams. The inspections consisted <br />of a review of the project plans, a site visit, and a letter report of observations, <br />conclusions and recommendations. The reports identified the portions of the <br />facilities that were most vulnerable to attack by terrorists and recommended <br />methods and procedures to mitigate these vulnerabilities. <br />Vulnerability Assessment and Emergency Response Plan SOQ page 1 1 <br />