My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004
City-of-Paris
>
City Council
>
Minutes
>
2000-2009
>
2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 4:25:54 PM
Creation date
9/1/2015 2:42:29 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1802
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FREESE AND <br />NICHOLS: <br />HELPING YOU <br />PROTECT YOUR <br />WATER SUPPLY <br />Innovative approaches . . <br />�X�� <br />Mr INNOW <br />Freese aw Nichols <br />practical results <br />The following projects represent recent V /As and associated surveillance and <br />security system projects: — <br />Surveillance and Security System Improvements <br />Wesley Seale Dam /Choke Canyon Dam /Pump Station <br />FNI designed a system that will provide video surveillance and access <br />security at two large high- hazard dams, one small dam, and two water <br />transmission pump stations. FNI is also providing representation <br />services while the project is in construction. The design included the <br />identification of critical points in the system to be monitored or <br />secured, siting of video cameras based on the viewing coverage needed, and the <br />selection and specification of the surveillance and security hardware and software. <br />The project also includes renovations to an existing building to create an <br />Emergency Operations Center at one of the large dams to provide remote <br />monitoring of the other sites. The design of the remote monitoring network <br />included the selection of a telecommunications architecture that would be cost - <br />effective and still provide the required surveillance. <br />Vulnerability Assessment and Security Inspections AEP Power Plant <br />Dams <br />American Electric Power Company, Texas , <br />FNI was hired by the American Electric Power Company to conduct <br />security inspections at five power plant cooling water dams located in <br />Texas, Arkansas and Louisiana. The inspections consisted of a review of the project — <br />plans, a site visit and a letter report of observations, conclusions and <br />recommendations. The report identified the portions of the facilities that were most <br />vulnerable to attack by terrorists and recommended methods and procedures to <br />mitigate these vulnerabilities. <br />Vulnerability Assessment and Emergency Response Plan SOQ page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.