My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004
City-of-Paris
>
City Council
>
Minutes
>
2000-2009
>
2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 4:25:54 PM
Creation date
9/1/2015 2:42:29 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1802
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Innovative approaches . . <br />Now 111111111111111111W <br />Fre *so .M Nrnals <br />practical results <br />Russell Gibson, P.E. <br />System Assessment /Support <br />Years Experience: 21 <br />Registration: Professional Engineer, Texas 1987 ( #61883) <br />Education: B.S., Civil Engineering, Texas A& M University, 1981 <br />Mr. Gibson has designed and managed a variety of water transmission projects as a <br />member of Freese and Nichols' Pipeline and Pump Station Department. <br />Assignments he has been responsible for include design and resident representation <br />of water distribution and wastewater collection system improvements, water storage <br />facilities, and major water transmission systems. <br />Project Experience: <br />Domestic Water System Improvements - Texas A &M University - Project <br />manager for design improvements. The project included adding a 3 million gallon <br />ground storage tank, pipeline extensions, various cross - connections and valve <br />improvements, joint bonding and cathodic protection to pipelines and various <br />instrumentation and electrical improvements. <br />Bryan East Side Access Road Project - City of Bryan, Texas - Design engineer <br />for wastewater utilities on the Bryan East Side Access Road Project with 12 -inch and <br />smaller wastewater collection mains. <br />Onion Creek and Boggy Creek Wastewater Interceptor - City of Austin, <br />Texas - Project engineer on the Onion Creek and Boggy Creek Wastewater <br />Interceptor, with 13,000 linear feet of 36 -inch and 54 -inch wastewater lines at a <br />construction cost of $4.2 million. <br />Southwest Borger Sewage Collection System - City of Borger, Texas - Project <br />and construction engineer for the Southwest Borger Sewage Collection System <br />covering gravity sewer, force main and lift station design. <br />Broker Lane Street Project - City of Austin, Texas - Design engineer for <br />wastewater utilities on the Broker Lane Street Project east of Loop 1 (MOPAC) <br />including 10 -inch wastewater collection mains. <br />Nolan Creek Tributary II Wastewater Interceptor - City of Killeen, Texas - <br />Project manager for the Nolan Creek Tributary II Wastewater Interceptor with <br />20,000 feet of 6 -inch to 36 -inch wastewater lines. <br />Willow Springs Wastewater Interceptor Preliminary Phase I - City of Killeen, <br />Texas - Project manager for the Willow Springs Wastewater Interceptor Preliminary <br />Phase I, including 24,000 feet of 30 -inch and 36 -inch wastewater interceptor. <br />South Killeen Wastewater Master Plan Study - City of Killeen, Texas - Project <br />manager for the South Killeen Wastewater Master Plan Study. <br />Downtown Borger Sewer Replacement Project - City of Borger, Texas - Project <br />design and construction engineer for the Downtown Borger Sewer Replacement <br />project. <br />Wastewater Interceptors Project - City of Keene, Texas - Project manager for the <br />Wastewater Interceptors Project, including 30,000 feet of 10 -inch to 18 -inch <br />wastewater interceptors. <br />Water System Vulnerability Assessment and Emergency Response Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.