My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996
City-of-Paris
>
City Council
>
Minutes
>
1990-1999
>
1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 9:39:59 AM
Creation date
9/2/2015 9:33:02 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
995
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00 <br />RESOLUTION NO. 96 -015 <br />WHEREAS, the City Council of the City of Paris did heretofore, in Resolution <br />No. 94 -110, award the contract for the Water Treatment Plant Expansion, 92WSRB03- <br />92 Project to ARCHER- WESTERN CONTRACTORS, LTD.; and, <br />WIIEREAS, the City Engineer, Earl S. Smith, acting as project engineer of said <br />project recommends the amendment of said contract by Change Order No. Two attached <br />hereto as Exhibit "A ", which provides for a net increase in contract price of $32,288.38 <br />for the purpose of making modifications to electrical ductbank at North Chemical Building; <br />the addition of exterior lighting on west side of existing Filter Building; making <br />modifications to the painting of various existing concrete structures; making modifications <br />to the painting of various new concrete structures; making modifications to the Transfer <br />Pumps Power Supply wiring; and making modifications to the transfer pumps RTD's and <br />Space Heater Wiring, for a total of $4,845,842.06, and such form should be approved, and <br />the Mayor should be authorized to execute the same; NOW, THEREFORE, <br />BE IT RESOLVED BY THE CITY COUNCIL OF TIIE CiTY OF PARIS, that <br />the Water Treatment Plant Expansion, 92WSRB03 -92 Project, contract is hereby <br />amended by Change Order No. Two attached hereto as Exhibit "A ", providing for a net <br />increase in contract price of $32,288.38 for the purpose of making modifications to <br />electrical ductbank at North Chemical Building; the addition of exterior lighting on west <br />side of existing Filter Building; making modifications to the painting of various existing <br />concrete structures; making modifications to the painting of various new concrete <br />structures; making modifications to the Transfer Pumps Power Supply wiring; and making <br />modifications to the transfer pumps RTD's and Space Beater Wiring, for a total of <br />$4,845,842.06, which is, in all things, approved; and, <br />BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Eric S. <br />Clifford, be, and he is hereby, authorized and directed, on behalf of the City of Paris, to <br />execute said Change Order No. Two. <br />PASSED AND ADOPTED this 12th day of February, 1996. <br />Eric S. Clifford, Mayor <br />ATTEST: <br />Mattie Cunningham, City Clerk <br />APPROVED AS T9 FORM: <br />'1'. K. Ilaynes, Ciy✓Attorney <br />
The URL can be used to link to this page
Your browser does not support the video tag.