Laserfiche WebLink
C. PROJECT COST EVALUATION (0 -20 Points) <br />In the space below, provide an evaluation of the costs associated with the <br />proposed project, based on specific questions listed in the scoring criteria. <br />Please attach additional pages if needed. . <br />Listed below is the proposed total cost of the project. <br />We estimate that each house will require twenty -four (24) <br />loads per house for twenty -four (24) houses or 576 total <br />loads in a twelve (12) yard truck. <br />r <br />576 loads x 12 yard truck = 6,912 total yards <br />Of the 6,912 yards, we estimate 1,912 yards or 27% will go <br />straight to landfill because it is not suited for tub grinder <br />because of metal, concrete, asphalt, shingles, etc. <br />This•leaves us with 5,000 yards to grind. <br />5,000 yds. to grind An 20 hrs. at 250.00 per hr.- $5,000.00 <br />After tub grinder we will have 1,250 yds. left <br />that goes to landfill at $7.82 per yd. - $9,775.00 <br />Trucking the 1,250 yds. of sawdust will cost <br />$17.50 per load or 104 loads - $1.822.92''•' <br />The 1,912 yards that went straight to landfill <br />cost $60.00 per'load or 159 loads - $9,560.00 <br />The 1,912 yards cost $7.82 per yard to go to ' <br />landfill - $14,951.84 <br />Taking the 5,000 yards from 24 housing sites <br />_. to collection area (12 yards per load @ $60.00 -$25,000.'00 <br />per load) <br />Total Cost $66,109.76 <br />If all 6,912 yds. had gone 6,911 x 7.82 $54,051.84 <br />straight to landfill and no 576 loads @ $60= 34,560.00 r' <br />tub grinding it would cost--- --------------- -- - - - - -- 88, 611.84 <br />So Savings Is $22,502.08 <br />9 <br />•3 <br />