My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995
City-of-Paris
>
City Council
>
Minutes
>
1990-1999
>
1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 9:44:28 AM
Creation date
9/2/2015 9:43:47 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCLUSION: Pat Turpin's suspension of two weeks is upheld. <br />No one else appeared before the Council, and the public hearing was <br />closed by Mayor Shelton. <br />A motion was made by Councilman Clifford to affirm the City Manager's <br />action regarding the grievance of Pat Turpin. The motion was seconded <br />by Councilman Fulbright, and carried 7 ayes, 0 nays. <br />Mayor Shelton referred a proposal of the Red River Valley Fair <br />Association for street closure on the fairgrounds to the Planning and <br />Zoning Commission on February 6, 1995, and before the City Council <br />February 9, 1995. <br />City Attorney Haynes did not have any reports for the Council. <br />City Manager Malone reported that on the Raw Water Line Project the <br />pipeline is installed and in use, we still need to rehabilitate one of <br />our pumps and correct balance problems on existing motors, and the <br />project is now 99% complete with a total construction cost of <br />$3,700,008.00. <br />City Manager also reported that the Booster Pump Station - the project <br />is approximately 80% complete, the total construction cost <br />$2,089,331.00. The justification for this project is to rearrange the <br />pumping system and lower electrical cost. <br />City Manager said the Water Treatment Expansion Project is <br />approximately 7% complete, total construction cost of $4,783,965.00. <br />There being no further business the me e i g ad j r d� 8:40 P. M. <br />O'N SHELTOW, 1"AYM.,,/VTY OF PARIS <br />ATTEST: <br />MATTIE CUNNINGHAM, CITY ERK <br />877 <br />
The URL can be used to link to this page
Your browser does not support the video tag.