My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990
City-of-Paris
>
City Council
>
Minutes
>
1990-1999
>
1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 12:39:52 PM
Creation date
9/2/2015 12:30:58 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
632
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />to Agreement <br />Between Owner and Engineer <br />for Professional Services <br />Further Description of Basic Engineering Services and Related <br />Matters <br />1. This is an exhibit attached to, and made a <br />r <br />.incorporated by reference into the Agreement, made on anuary <br />8, 1990, between the City of Paris (OWNER) and Hayter <br />Engineering, Inc. (ENGINEER), providing for professional <br />engineering .services. The basic services of ENGINEER as <br />described in Section 1 of the Agreement are amended or <br />supplemented' as indicated below. <br />Project 1 <br />2. System Inspection Phases shall include the following: <br />The ENGINEER will perform a field review of each of 118 ( +) <br />point repair locations. These will be initially located by using <br />Volume II of the City's previous Infiltration /Inf low Analysis. <br />The ENGINEER will measure and verify the location of these <br />point repairs . The 118 point repairs to be so located are to be <br />selected by the city engineer. It is estimated that <br />approximately one half of these will require smoke testing to <br />relocate. At this stage, the ENGINEER will provide one two- <br />man smoke testing crew and complete equipment, together with <br />one additional technician who will work in conjunction with a <br />similar smoke <br />.testing crew and equipment to be <br />the OWNER. The ENGINEER will provide coordination by <br />nation of both <br />crews. Smoke bombs for the OWNER'S crew will be provided <br />by the OWNER. Smoke bombs for the ENGINEER'S crew will <br />be provided by the ENGINEER. <br />It is anticipated that the points located will be discussed in <br />consultation with the OWNER'S staff. In this manner, <br />completed findings will be agreed to, and repair techniques will <br />be selected. An interim written report will not be prepared. <br />The ENGINEER will be authorized to proceed with the <br />preliminary design and field surveys phase. <br />3. Preliminary .Design and Field Surveys Phase shall involve <br />securing 8"x8" reproducibles of 1" = 20' scale aerials <br />surrounding each of the 118 point repair locations. These will <br />be mounted on 24" x 36" sheets and field surveys will be <br />provided to locate existing small topographic features, and <br />check the depths of existing sewer lines where possible. The <br />ENGINEER will consult with area utilities regarding locations of <br />existing lines, including water and sewer, gas, telephone and <br />electric. These will be indicated on the drawings as identified <br />by the respective utility. Upon completion of this phase, the <br />Page 15 of 17 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.