My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990
City-of-Paris
>
City Council
>
Minutes
>
1990-1999
>
1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 12:39:52 PM
Creation date
9/2/2015 12:30:58 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
632
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />ENGINEER will proceed with final design of the plans and <br />specifications. <br />4. For purposes of determining the scope of work, it is agreed <br />between OWNER and ENGINEER that the estimated number of <br />point repairs is 118, and that any significant variation from <br />this number would be cause to adjust the contract amount, <br />upwards or downwards, as appropriate. Because the nature of <br />the work contained in this project is repair and maintenance, <br />rather than construction of new facilities, it is not anticipated <br />that Texas Water Commission review of the plans and <br />specifications will be required. <br />Project 2 <br />5. System Inspection Phase - For Project 2, the scope of work is <br />anticipated to include replacement of line segments in the <br />drainage basins of the Woodard lift station and the southeast. <br />lift station. It is estimated that 28 segments will be replaced <br />in the Woodard lift.station basin, totalling approximately 19,000 <br />linear feet. In the southeast lift station drainage basin, it is <br />estimated that 24 segments will be replaced, totalling about <br />15,000 linear feet. These are preliminary estimated based upon <br />previous infiltration/inflow studies. <br />The system. inspection phase for this project will be performed <br />entirely by the OWNER. The OWNER'S staff will conduct TV <br />inspection of various line segments identified for replacement. <br />Based upon these inspections, the OWNER'S staff would advise <br />the ENGINEER as to the footage and location of line to be <br />replaced. Upon receipt of these locations from the OWNER, <br />the ENGINEER will proceed with the preliminary design and <br />field surveys phase. <br />6. It is anticipated that the work projected in Project 2 will be <br />developed for construction purposes as three contracts, which <br />will be divided between the southeast area in one contract, <br />with the Woodard area being divided into east and west <br />segments. Three separate bid openings would be conducted and <br />engineering supervision would be provided for three separate <br />construction projects. <br />The ENGINEER'S basic compensation under Project 2 shall <br />include services during bidding and award, and shall include <br />design field surveys which are normally additional services as a <br />portion of the basic contract. <br />Page 16 of 17 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.