Laserfiche WebLink
%J <br />PARIS, TEXAS <br />1985 MASTER PUMP STATION 1 <br />REHABILITATION PROJECT <br />CHANGE ORDER NO. 1 <br />I. SCOPE. This Change Order No. 1 provides for the deletion of the <br />screening equipment in the wetwell. <br />II. REASON FOR CHANGE. When the wetwell was drawn down for installation of <br />the screen the invert elevation of the 30 inch sewer was lower than expected. <br />The sewer invert was.actually at the top of the concrete fillet. In order to <br />install the screen major demolition of the fillet would be required. Also, <br />with the pipe being.lower in the wetwell, the basket would be completely <br />submerged, allowing .floatables to enter the wetwell. Since full advantage of <br />the screenging device can not be recognized, it is recommended that it be <br />deleted. <br />III. BASIS FOR CHANGE. Due to the above change, the Contract Amount shall <br />be decreased as follows: <br />Total Change in Contract Amount 1,000. <br />Original Contract Amount 278,000. <br />Previous Change Orders 0. <br />New Contract Amount Including This <br />Change Order 277,000. <br />ALL OTHER PROVISIONS OF THE CONTRACT REMAIN THE SAME. <br />AGREED to this day of , 1986. <br />Recommended By: City of Paris, Paris, Texas <br />By <br />Title <br />Black & Veatch <br />Heritage Constructors, Inc. <br />By�- -` <br />Title <br />(PARIS, TEXAS) <br />(11967 ) 1 <br />