Laserfiche WebLink
i <br />Name of Bank <br />By rf <br />Title <br />Date <br />Councilman Wilson entered the Council room and assumed his chair at the Council <br />table. <br />Mayor Graham called for the tabulations of bids for reconstruction and repair <br />of sanitary sewer main between 2100 Block of West Austin Street and West <br />Sherman Street , and the following bids were presented: <br />Heuberger, Inc $ 3,695.00 <br />J -10, Inc. 12,205.00 <br />B. Bray Construction Co., Inc. 13,925.00 <br />Joseph Chie Contractor, Inc. 31,450.00 <br />City Manager Doty recommended the low bid of Neuberger Inc. in the amount of <br />$3,695.00. <br />Resolution No. 85 -019 authorizing and directing the Mayor to enter into a <br />contract with Neuberger, Inc. for reconstruction and repair of sanitary <br />sewer main between 2100 block of West Austin Street and 2100 block of West <br />Sherman Street was presented. A motion was made by Councilman Burnett, seconded <br />by Councilman Wilson, and the motion carried 7 ayes, 0 nays. <br />