Laserfiche WebLink
332 <br />EXHIBIT I <br />(15) Mitigation Measures <br />The following measures are included in this improvement project in order to minimize <br />the adverse effects of the project; these are; <br />1. construction will be limited to normal business hours, thereby reducing the impact of <br />the residential and school intrusion. <br />2. the project will conform to applicable State and Federal prescribed standards. <br />3. the construction site will be sprayed, when necessary, to reduce dust potential. <br />4. the project will include erosion control measures as prescribed by Soil Conservation <br />Service. <br />5. temporary daily access and alternative access will be provided, if necessary, to permit <br />area access. <br />6. all areas that have had soil disturbed will be reseeded in order to re- establish vegetation. <br />