My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1975
City-of-Paris
>
City Council
>
Minutes
>
1974-1979
>
1975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2015 9:35:06 AM
Creation date
9/3/2015 9:34:56 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addciiduril No. I. to <br />AgrCesent for Vi e s <br />a <br />City of Paris, T(-'�X'as <br />?rn <br />VqLF,.',_RE1kS Robert B. hayter, d:1)a Hay-ter and <br />the City of Pa-cis, acting by and through it's duly aUthol'iznd <br />did jointly enter into an aL,;recme:at dated August 1.�, 1 70, <br />for Services for improvements to the city's scwago <br />troat-,r,.ient facilities and development of an area wide sewera[oe <br />system; and <br />1,111a DEL S both parties mutually agree that said contract <br />covers other engineering services as may be required in thr,' <br />development of the Project, i.e. infiltration/inflow <br />studies, surveys, and evaluations; environmental a..se.ssmc.at.s <br />and evaluations; project coordination; and the project develop- <br />ment within the guidelines of the TWQB and the EPA- <br />NOW �ULE.1"M0,FOIRE BE IT AGIR-KED -to by the parties hereto <br />that tile follo-vring additions and modifications air.-c: made too <br />ancl, a pa:t,-t of said contract. <br />Section V1. <br />The :K-aGincer's Compensat-ion <br />D. Special Assignments and Services Not Included in -the <br />Above Percentage Charges <br />1.4) Infiltration/Inflow Evaluation; <br />environmental evaluation; <br />project coordination and-devel- <br />opment; and preparation-of <br />applications for financial <br />assistance during the pre- <br />lim,inary project phase. <br />Salary cost tinges a <br />multiplier of 2.6. <br />Reimbursement fox- direct <br />non-1 a7Qor exp en, e. and <br />sub contract e:x-pense <br />plas a IQ% service charge- <br />D. Special Assignments and Services Not Included in the <br />Above Percentage Charges <br />(4),(5),(6),(8)7(13) <br />The salary cost <br />multip-L-Ler is :revised <br />from. 2-3 to 2.6. . <br />11) Extra travel required Includes tra vel ti -me <br />of parties involved. <br />D. Special Ass-ignments and Services Not Included in. the <br />Above Percentage Charge <br />Second paragraph, last sentence - The salary cost of the <br />Engineer's Principals is established as 02.50 Per hour- <br />Exectiter-I this 25th cliy of Marcia, 1975. <br />M'n'.' OF I)ARITS <br />BY: <br />M <br />ROU,',111- B. 1-IM71FE"R <br />D/B/A T41AY-FFR ING <br />C I <br />Robe FIT 1110- <br />EXI I Mrr iA <br />
The URL can be used to link to this page
Your browser does not support the video tag.