My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24 - CONSTRUCTION INSPECTIONS
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2015
>
11 NOVEMBER
>
11/16/2015
>
24 - CONSTRUCTION INSPECTIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 9:48:54 AM
Creation date
11/12/2015 12:51:27 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Paris — Construction Inspection H.W. Lochner, Inc. <br />ATTACHMENT B <br />SERVICES TO BE PROVIDED BY THE CITY <br />The City will perform or provide to the Consultant the following items subject to availability: <br />A. Electronic or paper copies of project design files. <br />B. Material Testing Laboratory Services and Field Testing. <br />C. Applicable electronic or paper copy of all previous construction inspection documents <br />(diaries, test reports, RFI's, change orders, etc.) for previous or current construction <br />projects associated with current Bond program. <br />D. Host or provide meeting space for project meetings. <br />E. Conduct preconstruction conferences for the project. <br />F. Verify all materials used meet specifications. <br />G. Track all shop drawing submittals, perform reviews and recommend approvals. <br />H. Review all sampling and testing documentation submitted by the contractor for <br />compliance with applicable state and local regulations, standards, and contract <br />requirements. <br />I. Prepare and negotiate change orders. <br />J. Conduct meetings and generate meeting minutes. <br />K. Document installed work on the as- built/ record drawings <br />L. Public relations activities. <br />M. Review plan changes, construction issues, traffic changes, public information topics to <br />include review and approval of the contractor's baseline schedule as well as monitoring <br />the schedule. <br />N. Develop plans to address design needs due to field changes. <br />O. Certify as to the acceptability of each project upon its completion. <br />Page 1 of 1 Attachment B <br />
The URL can be used to link to this page
Your browser does not support the video tag.