My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 - Contract Award to Oscar Renda - 2014 Bond Fund Water & Sewer - Package 4
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2015
>
12 DECEMBER
>
12/14/2015
>
26 - Contract Award to Oscar Renda - 2014 Bond Fund Water & Sewer - Package 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 2:56:43 PM
Creation date
12/10/2015 2:50:57 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 26 <br />memorandum <br />TO: Mayor & City Council <br />FROM: John Godwin, City Manager <br />SUBJECT: PACKAGE 4 UTILITIES BID AWARD <br />DATE: December 7, 2015 <br />BACKGROUND: We received and opened four qualified bids on November 17. Our latest <br />project estimate was $25 million, and we were very pleased that two of the bids were actually <br />below that estimated cost, even when adding in a significant amount of road overlay work we <br />were not sure we could afford. The apparent low base bid was received from Kodiak in the <br />amount of $22,510,615. The apparent lowest base bid plus various combinations of the 14 <br />additive alternatives is Oscar Renda. <br />STATUS OF ISSUE: This project will include extensive work in many locations, including <br />much of downtown, Clarksville Street, and a complete reconstruction of Pine Bluff, among other <br />locations. Work will last between 36 and 48 months, depending on phasing, unknown buried <br />hazards, and weather. There will be significant inconvenience, traffic disruptions, and muddy <br />messes. It will in the end be worth it, however, and we very much look forward to these major <br />improvements to the infrastructure of Paris. <br />In analyzing the bid alternates, we took into account two different methods by which roads might <br />be overlaid after basic repairs are completed: traditional hot mix asphalt or a new micro - surface <br />material. Both staff and the consulting engineer agreed that the traditional material should work <br />better under these conditions, and a recommendation to award the bid to Oscar Renda has been <br />made on that basis. <br />BUDGET: Funded through 2013 bond proceeds. <br />RECOMMENDATION: Award a contract to Oscar Renda in the amount of $23,348,350. <br />
The URL can be used to link to this page
Your browser does not support the video tag.