My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18 - UTILITIES CONSTRUCTION UPDATE
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2016
>
04 APRIL
>
04/11/2016
>
18 - UTILITIES CONSTRUCTION UPDATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 11:05:18 AM
Creation date
4/7/2016 10:52:39 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 6, 2016 <br />2013 Bond Fund for Water and Sewer Improvement Projects <br />Contract131 ...................................................................................................................... ..............................1 <br />ContractB2 ...................................................................................................................... ..............................1 <br />Package4 ......................................................................................................................... ..............................3 <br />JohnsonWoods Drainage ................................................................................................ ..............................3 <br />SELift Station ................................................................................................................... ..............................4 <br />Contract B1 <br />Project Manager: <br />Inspector: <br />Contract Amount: <br />Funding Source: <br />Jerry McDaniel <br />Tim Moore /Michael Smith <br />$2,425,002.00 <br />2013 Bond Fund <br />Design Engineer: <br />Contractor: <br />Testing Lab: <br />Billed to Date: <br />AECOM <br />Bray Construction <br />Apex Geoscience <br />$2,443,032.00 <br />Description: Replace water and sewer lines in west Paris. <br />Current Status: Construction substantially complete. Working on project punch list and completion. <br />Key Dates: October 17, 2014 Bid Award <br />December 15, 2014 Notice to Proceed <br />January 12, 2016 Scheduled Final Completion <br />April 11, 2016 EST to Present Post Construction Inspection Report <br />Current Tasks: ❑ 19`h SW Cleanup <br />❑ Final walk through, issue punch list and restart time <br />Upcoming Tasks: ❑ Receive post- construction inspection report from EST Engineering Services <br />❑ Project closeout <br />Contract B2 <br />Project Manager: Jerry McDaniel Design Engineer: AECOM <br />Inspector: Tim Moore /Michael Smith Contractor: Pittard <br />Testing Lab: Apex Geoscience <br />Contract Amount: $3,041,970.00 <br />Funding Source: 2013 Bond Fund <br />Billed to Date: $1,679,429.00 <br />Description: Replace water and sewer lines in west Paris. <br />Current Status: Construction 60% complete. <br />28`h NW — 6" water; pressure test failed; small leak <br />sewer installed; not in service due to change order deep manhole replacement City: curb and <br />gutter replacement to begin 4.4.16; asphalt removal not complete; blade level not complete; <br />work in progress <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.