My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18 - UTILITIES CONSTRUCTION UPDATE
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2016
>
04 APRIL
>
04/11/2016
>
18 - UTILITIES CONSTRUCTION UPDATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 11:05:18 AM
Creation date
4/7/2016 10:52:39 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 6, 2016 <br />29th NW — 6" water; pressure test passed; Bac -T failed — retest 4.8.16; not in service <br />sewer complete (in service) <br />City: curb and gutter complete; asphalt removal to begin 4.5.16; blade and level up continues <br />30th NW — 6" water; pressure test passed; Bac -T passed; new line is in service <br />sewer complete in service <br />City: curb and gutter not complete; asphalt removal complete; blade and level up not <br />complete; work in progress <br />31St NW — 6" water; pressure test passed; Bac -T passed; new line in service <br />sewer complete in service <br />City: asphalt removal complete; blade level not complete; curb and gutter not complete <br />32nd NW — 6" water; pressure test passed; Bac -T passed; main in service <br />service transfers not complete — starting 4.6.16 <br />sewer complete in service <br />City: asphalt removal not complete; contractor working on soft spot 4.5.16; curb and gutter <br />not complete; blade level not complete <br />33rd NW — 6" water; pressure test passed; Bac -T failed — retest 4.8.16; not in service <br />sewer complete in service <br />City: asphalt removal not complete; curb and gutter not complete; blade level complete <br />Bonham — Loop to 25th NW water main installed <br />25th NW to 29th NW pressure test not complete; Bac -T not complete <br />29th NW to 32nd NW pressure test passed; Bac -T passed <br />32nd NW to Loop installed; pressure test not complete; Bac -T not complete <br />13th NW to 25th NW not complete (started) <br />NOTE: (13th NW — 25th NW —10 "); (25th NW to 27th NW —12 "); (27th NW to Loop —10 ") <br />Key Dates: July 13, 2015 Notice to Proceed <br />Sept 23, 2015 Construction Began <br />May 10, 2016 Estimated Date for Paving Repairs <br />May 15, 2016 Final Completion <br />Current Tasks: ❑ Bonham St water installed from 27th to Loop <br />❑ Pavement repair changed from micro - surface to HMAC overlay - $99,500 CO Approved by <br />CC 3/14/16 <br />❑ City Street Dept working to level up to prepare for HMAC <br />Upcoming Tasks: ❑ Complete pavement repairs and all utility work <br />❑ Project closeout <br />❑ Liquidated damages $500 per day <br />Page 2 of 4 <br />