Laserfiche WebLink
Paris Economic Development Corporation Paris IndustriN.Park <br />March 14, 2003 Paris,Texas <br />P2003.068 Page 2 <br /> <br />BASIC SERVICES <br /> <br />We propose to perform the various services listed below that have been requested by the Client. Some <br />of the tasks listed are interrelated, and are generally not separable within this proposal, except for the <br />purpose of describing the scope of work. <br /> <br />The following lists the tasks and estimated fees anticipated as necessary for your project: <br /> <br />TASK 1 .- SURVEYING SERVICES <br /> <br />It is our understanding that a surveying firm is employed by Paris EDC to produce a topographic map <br />showing contours at 1' intervals. This shall be the. basis for our design. <br /> <br />TASK 2 - PRELIMINARY ENGINEERING <br /> <br /> 1. Visit site to observe existing conditions. <br /> 2. Meet with EDC to establish design parameters. <br /> 3. Obtain Architect's Final Site Plan to be used for design. <br /> 4. Analyze alternates for stormwater detention. <br /> <br />TASK 3 - CIVIL DESIGN PACKAGE <br /> <br />This phase includes the detailed design and preparation of construction plans for the development, to be <br />reviewed and considered for approval by the Client, <br /> <br /> A. Utilize the boundary survey of the property (provided under separate contract by others.) <br /> B. Utilize the topographic survey and mapping of the property (provided under separate <br /> contract by others.) A detailed topography survey (with elevation contours) of the property is <br /> required to design the streets and drainage features. <br /> C. Prepare construction plans. Design the streets, drainage features, and water utilities (water, <br /> fire protection, and sanitary sewer). This includes street horizontal and vertical alignment, <br /> pavement sections, inlet and outlet structures, bridges, crossings, pipes, channels, lines, <br /> manholes, fire hydrants, valves, and appurtenances. <br /> <br /> The following 'on-site" plans are typically required for subdivision developments. Some <br /> drawings may be combined, depending on the complexity of the particular drawings. Not all <br /> drawings may be required for this project, depending on the specific project presentation. <br /> <br /> · Cover Sheet - project information, vicinity map. <br /> · Specifications, Typical Sections, and Geotechnical Information (provided by Client) - <br /> shows roadway or street sections, certain specifications, and soil boring logs. <br /> · Drainage Area Map and Calculations - delineates drainage areas, shows runoff, curb <br /> inlets, sag inlets, grate inlets, storm sewer calculations, and tabular storm sewer <br /> summary. <br /> <br />Occasionally ACEI is asked to provide plans based on topographic mapping by others. Under this circumstance, our liability <br />must be limited accordingly. AIso, increased charges usually apply due to additional manipulation of data files provided by <br />others, as required to integrate data into our CADD- system. A nominal allowance for this has been included in the estimates <br />herein. <br /> <br /> Initial: <br /> <br /> <br />