My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Toole Design Group Memorandum
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2018
>
10 - OCTOBER
>
October 8
>
09 - Toole Design Group Memorandum
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 10:53:17 AM
Creation date
10/4/2018 10:50:06 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F6mG"puM"a" 4' �ma <br />The restoration of both one-way pairs requires new cross sections. The current cross-sections vary <br />block -by -block in both right-of-way and curb -to -curb measurements. Therefore, a detailed survey will <br />need to be conducted prior to moving forward. The proposed cross-sections are based on the most <br />constrained conditions along each street. The design team recognized that a complete rebuild of the <br />street may not be feasible for financial or other reasons and have suggested both retrofit measures and <br />rebuilt cross-sections. <br />a a t Street <br />15t Street and Main Street are the primary north -south streets in downtown Paris. 15t Street NW <br />currently provides access southbound, while Main Street provides access northbound. Both streets <br />provide on -street parking and two travel lanes in their respective directions. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.