Laserfiche WebLink
lq12,�:(... o ies <br />OWNER 2 <br />ENGINEER 1 <br />CONTRACTOR 1 <br />A. Immediately correct any work that is not in compliance with the Contract Documents <br />or submit a written explanation of why the work is not to be corrected immediately <br />and when the corrective work will be performed. <br />B. Payment for non -conforming work shall be withheld until work is brought into <br />compliance with the Contract Documents. <br />A. The testing laboratory representative is limited to providing consultation on the test <br />performed and in an advisory capacity. <br />B. The testing laboratory is not authorized to: <br />1. Alter the requirements of the contract documents. <br />2. Accept or reject any portion of the work. <br />3. Perform any of the duties of the CONTRACTOR. <br />4. Stop the work. <br />PART 2 PRODUCTS <br />2.01 TESTING APPARATUS <br />Furnish testing apparatus and related accessories necessary to perform the tests. <br />Test piping as described in Specification Section 33 04 40 — Cleaning and Acceptance <br />Testing of Water Mains and Specification and Section 33 31 20 — Polyvinyl Chloride (PVC) <br />Sewer Pipe, as applicable. Test manholes as described in Specification Sections 33 39 10 — <br />Cast -in -Place Concrete Manholes and 33 39 15 — Precast Concrete Manholes, as applicable. <br />City of Paris, Texas 01 40 00 _ Page 4 of 4 Quality Control <br />9/10/2020 <br />