My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
12 - DECEMBER
>
December 14
>
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:06:14 AM
Creation date
12/10/2020 9:49:16 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />M, Milf i i, 101 <br />A. Comply with requirements of the General Conditions and specified administrative <br />procedures in closing out the Construction Contract. <br />A. See Section 01 33 00 -- Submittals. <br />A. Submit written notification that the work or designated portion of the work is <br />substantially complete to the OWNER when the work is considered to be <br />substantially complete per the General Conditions. Include a list of the items <br />remaining to be completed or corrected before the project will be considered to be <br />complete. <br />E. OWNER shall visit the project site to observe the work within a reasonable time after <br />notification is received to determine the status of completion. <br />C. OWNER shall issue notification to the CONTRACTOR that the work is either <br />substantially complete or that additional work must be performed before the project <br />may be considered substantially complete. <br />1. OWNER shall notify the CONTRACTOR in writing of items that must be <br />completed before the project can be considered substantially complete. <br />a. Correct and note deficiencies in the work. <br />b. Issue a second written notice with a revised list of deficiencies when <br />work has been completed. <br />C. OWNER shall revisit the site and the procedure shall begin again. <br />2. When the project is considered to be substantially complete OWNER shall <br />prepare and send to the CONTRACTOR a definite Certificate of Substantial <br />Completion with a revised tentative list of items to be corrected or completed. <br />D. The CONTRACTOR shall be solely liable for any damage to property or <br />improvements as a result of the construction of this work. This CONTRACTOR will <br />cause to be protected all improvements on or off the right-of-way, such as fences, <br />buildings, signs, poles, utilities, trees, shrubs, etc., unless designated for removal, <br />and should such improvements be damaged, he shall make restitution to the <br />satisfaction of their OWNER. The CONTRACTOR shall be responsible for such <br />improvements that must be relocated or temporarily moved and shall do such work at <br />his cost. All damage to property or improvements shall be resolved prior to <br />substantial completion. Damages are subject to immediate resolution at the <br />OWNERS request. <br />.`L1' <br />A. Submit written certification when the project is complete and: <br />1. Contract Documents have been reviewed. <br />2. Work has been completed in compliance with the Contract Documents. <br />City of Paris, "'i"exas 01 7000 Page 1 of 4 Contract Closeout <br />9/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.