Laserfiche WebLink
H. Construct mock-ups from the actual products to be used in construction per <br />Specifications. <br />I. Submit color charts and Samples for every product requiring color, texture or finish <br />selection. <br />• II ON III, iI !II 1�111 III <br />•1 1 .11, 11 "1•� <br />2. Do not submit color charts and Samples until all record data have been <br />submitted or Shop Drawings for the products have been approved. <br />3. Submit color charts and Samples not less than thirty (30) days prior to when <br />these products are to be ordered or released for fabrication to comply with the <br />schedule for construction of the Project. <br />J. Submit Contract Modification Request per Section 01 31 00 Project Administration to <br />request modifications to the Contract Documents. <br />K. The number of copies of each submittal to be sent by the CONTRACTOR and the <br />number of copies of each submittal to be returned are: <br />Description <br />No. of <br />Copies Sent <br />No. of <br />Copies <br />Returned <br />Application for Payment <br />3 <br />1 <br />Contract Modification Request <br />3 <br />1 <br />Certified Test Report <br />3— <br />0 <br />Notification by Contractor <br />3 <br />1 <br />Preliminary O&M Manuals <br />- <br />- <br />Final O&M Manuals <br />- <br />- <br />Preconstruction Videos <br />2 <br />0 <br />Record Data <br />3 <br />0 <br />Request for Information <br />3 <br />1 <br />Sample <br />2 <br />0 <br />Shop Drawings <br />3 <br />1 <br />Schedule of Progress <br />3 <br />0 <br />A. Shop drawings are reviewed in the order received, unless CONTRACTOR request that <br />a different priority be assigned. <br />B. Mark a submittal as "Priority" to place the review for this submittal ahead of submittals <br />previously delivered. Priority submittals will be reviewed before other submittals for <br />this Project which have been received but not reviewed. Use discretion in the use of <br />ority" submittals as this may delay the review of submittals previously submitted. <br />Revise the Schedule of CONTRACTOR's Submittals for substantial deviations from <br />the previous schedule. <br />C. Review procedures vary with the type of submittal as described in Paragraph 1.06. <br />1.06 SUBMITTAL REQUIREMENTS <br />A. Shop Drawings are required for those products that cannot adequately be described <br />in the Contract Documents to allow fabrication, erection or installation of the product <br />without additional detailed information from the Supplier. <br />B. Shop drawings are requested so that the ENGINEER can: <br />City of Paris, Texas 01 33 00 — Page 4 of 11 Submittals <br />9/10/2020 <br />