My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 & 14 Building Code Updates (2)
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
04 - APRIL
>
April 10
>
13 & 14 Building Code Updates (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 12:20:03 PM
Creation date
4/6/2023 10:36:35 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Evidence acceptable to the authority having jurisdiction such as <br />a manufacturer's self-evaluation or an engineering judgment signed <br />and sealed by a qualified Registered licensed Professional Engineer in <br />the State of Texas. <br />Informational Note: Additional documentation for equipment may include <br />certificates demonstrating compliance with applicable equipment standards, <br />indicating special conditions of use, and other pertinent information. <br />[The remainder of the section, through and including Subsection (G), remains <br />unchanged.] <br />Amend Section 505.7 Special Precaution, Subsection (A), Implementation of Zone <br />Classification System, to read as follows: <br />505.7 Special Precaution. [Existing text unchanged.] <br />(A) Implementation of Zone Classification System. Classification of areas, <br />engineering and design, selection of equipment and wiring methods, <br />installation, and inspection shall be performed by a qualified persons <br />Registered licensed Professional Engineer in the State of Texas. <br />[The remainder of the section, up through and including Subsection (Fj <br />remains unchanged.l <br />Amend Article 695.6, Power Whiner, Subsection (A).(1), Services and On-site Power <br />Production Facilities, to read as follows <br />695.6 Power Wiring. [Existing text unchanged.] <br />(A) SuIply Conductors. <br />(1) Services and On-site Power Production Facilities. <br />Service conductors and conductors supplied by on-site power production <br />facilities shall be physically routed outside a building(s) and shall be installed <br />as service -entrance conductors in accordance with 230.6, 230.9, and Parts 111 <br />and IV of Article 230. Where supply conductors cannot be physically routed <br />outside of buildings, the conductors shall be permitted to be routed through <br />the building(s) where installed in accordance with 230.6(11 or (2l. <br />[The remainder of the section, up through and including Subsection (J), remains <br />unchanged.] <br />59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.