My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16 - Amendment No 3 to Professional Services Agreement with Computer Information Systems - Digi-Ticket E-Citation System
City-of-Paris
>
City Council
>
Agenda Packets
>
2024
>
01 - JANUARY
>
01-22-2024
>
16 - Amendment No 3 to Professional Services Agreement with Computer Information Systems - Digi-Ticket E-Citation System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 2:32:42 PM
Creation date
1/18/2024 2:30:35 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARRS POLICE DEPAkTMIENT TEXAS <br />LICENSE AGREEMIENT #345 <br />08-Z2-2007 <br />The Acceptance for Special Program Product(s) is detailed in Addendum R(3). <br />The accQptance procedure may be performed on a phased basis upon delivery <br />of each $peclal Program Product(s)- <br />3.5.4 Other Program Product(s) are accepted in accordance with Amendment 02 and <br />Addendum R(3). <br />3.5.5 Train User for On -Site Readiness for On -Site Training. <br />3.5.6 Deliver a hard and soft copy of the Trainer Guide(s) and Operator Guide(s) for <br />the System (s) for use in preparation of staff for on-site training. <br />3.5.7 User will execute Sign -Off Sheets for Training, Delivered .items, and <br />Acceptances. <br />This Task is complete when CIS provides User Training at CIS, Manuals <br />and the Systems) Acceptance is conducted. <br />3.6 TASK &INSTALLATIONS AND SYSTEM ACCEPTANCE VERIFICATION <br />3.6.1 Initial Installation and Acceptance <br />3.5.2 Installation <br />CIS will electronically install the System (including any Code Table additions and <br />modifications from Task 5 above) on the User's Servers on completion of Task 5 <br />above. <br />3.6.3 Acceptance <br />CIS will Verify for the User that the System functions on User's Server(s) as <br />Accepted at CIS. This. Verification completes Acceptance of the Basic Program <br />Products, $Ystem(s) in accordance with Addendum M(2) and available Special <br />Program Products' Systems in accordance with R(3). <br />The day of Acceptance Verification is the Date of Installation of the System(s). <br />This Task i's complete when the Systems) are installed and Acceptance is <br />Verified. <br />3.7 TASK 7 --FINAL INSTALLTION AND ON-SITE PERSONNEL TRAINING <br />3.7.1 Final Installation <br />Final installation will be performed electronically fay SIS ors the day prior to Task <br />7, -Site Training detailed below. CIS will review the initial installations) and <br />21 <br />7.T fQQ tAr� i mv�q n -HT N`I-Mr_1WOD VGGLEL9Lb8T SZ =CZ LEBZJZZI80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.