Laserfiche WebLink
STATUS OF ISSUE: <br />There was a soft spot and dip on Pine Mill Road across from Aikin Elementary. This has been a <br />problem for years, and we were able to correct this with an 8" deep grind and extra asphalt. <br />Pine Mill extra Digout: 8'x16' = 128 SF = 14.22 SY <br />$80/SY = $1137.60 <br />$2500 Re -mobilization back to Pine Mill <br />Total : $3637.60 <br />Pine Mill Road by School <br />12' SE — They had a large soft spot near the old railroad crossing (now a trail crossing). They <br />ground an extra 4", put back 4" of Type B Asphalt, then topped it with 2" of Type D Asphalt. 240' <br />long X 12' Wide = 2880 SF = 320 SY <br />320 SY X $40 = $12,800. R.K. Hall charged no extra mobilization here because they did it when <br />they were already there. <br />201h SE — There was no subgrade rock below the 2" of asphalt that had previously been paved in <br />the 1980's. They had paved over bare dirt. We did the same excavation as on 121b SE. 1000 SY <br />at $40/SY = $40,000. R.K. Hall charged no extra mobilization here because they did it when <br />they were still in the general area. A lot of side roads in Paris were likely paved like this, and we <br />predict similar failures in the future, unfortunately. <br />