Laserfiche WebLink
<br />d. <br />. <br />. <br />. <br />. <br />. <br />. <br />:I <br />. <br />3 <br />~ <br />. <br />a <br />3 <br />3 <br />3 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />LARRY SHAW, CPA <br />Page 3 <br /> <br />. Regionalization of Tampa Bay Water, Tampa Bay, Fl Management Consultant. Participated in a state mandated study to <br />develop a regional water supply utility for three counties and three city utilities in the Tompa Bay, Florida area. Work <br />involved condition assessment of facilities with an engineering firm, the development of the initial cost based pricing <br />structure, the assignment of value to facilities donated by each member government and the development of member <br />contracts with the regional utility, <br /> <br />. Privatization Evaluations; Senior Management Consultant. Evaluated the appropriateness of privatizing all or a portion of <br />utility operations for utilities in Texas, louisiana, District of Columbia, Florida and Ohio. <br /> <br />. Utility System Evaluation, San Antonio, TX; Project Manager. Managed a project, with the assistance of two engineering <br />firms, to assess the condition of a water and wastewater system awned and operated by a develaper for potential purchase <br />by the City of Son Antonio. <br /> <br />Information Technology Project Experience <br />. Son Antonio Water System (SAWS) IT Master Plan, Son Antonio, Texas; Project Director. Carter 8. Burgess project team <br />members managed the development of a strategic IT plan identifying the vision and recommendations for technology for <br />the future. Entails evaluation of the current systems in information management, technology and automation. A specific <br />outsourcing study is also being performed. <br /> <br />. DWU Information Technology System Development 8. Implementation, Dallas, TX; Project Manager. Managed the design, <br />package selection and implementation of a customer accounting and billing system for the Dallas Water Utilities <br />incorporating water, wastewater, solid waste and storm water services. Performed on organizational assessment to reflect <br />the changes needed to accommodate and obtain maximum benefit from the designed billing system to be implemented <br />within twelve months. <br /> <br />. Information Technology System Development 8. Implementation, Various locations, TX; Management Consultant. Provided <br />technical assistance and quality assurance reviews for similar customer system projects in Tucson, Honolulu, Cincinnati, <br />Columbus, Trenton, Miami, Winnipeg, San Antonio and the Sam Houston Electric Cooperative. <br /> <br />. Information Technology System Development, San Antonio, TX; Project Manager. Managed the design, development and <br />implementation of financial planning, fixed assets, project tracking and inventory systems at a metropolitan wastewater <br />utility in Texas. <br /> <br />. Evaluation of Billing System's Development, San Antonio, TX; Project Manager. Managed the evaluation of a custom <br />designed and developed utility billing system for 0 water, wastewater and storm water utility in process of development by <br />another firm. Recommended abandonment of the project and restarting the project using standard and proven system <br />development methodologies. Performed similar engagements at another water utility and at a gas utility. <br />