My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-055-RES ACCEPT PROPOSAL OF CARTER & BURGESS FOR PROFESSIONAL ENGINEERING SERVICES TO WATER LOST AND UNACCOUNTED FOR STUDY IN CITY'S WATER AND ACCOUNTING AND OPERATING SYSTEM
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-055-RES ACCEPT PROPOSAL OF CARTER & BURGESS FOR PROFESSIONAL ENGINEERING SERVICES TO WATER LOST AND UNACCOUNTED FOR STUDY IN CITY'S WATER AND ACCOUNTING AND OPERATING SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:36 PM
Creation date
4/24/2002 6:57:22 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />9 <br />1I <br />II <br />:II <br />II <br />II <br />51 <br />iii <br />tI <br />:J <br />CI <br />at <br />3 <br />:I <br />a <br />:2 <br />2 <br />:I <br />:3 <br />:I <br />:::I <br />CI <br />~ <br />:I <br />~ <br />~ <br />:3 <br />tI <br />:J <br />QI <br />~ <br />tI <br /> <br />ALLEN MULLINS, CPA <br />Page 2 <br /> <br />. Woter Rote Study and Distribution System Assessment (Merger of little Rock and North little Rock Water Utility Systems); <br />Little Rock/North little Roc~ AR; Senior Management Consultant. Performing 0 cost of service water rate study including <br />evaluation of the need for impact fees and on updating of its ancillary fees and charges, This includes establishing financial <br />and service policies for the merged utility. An evaluation of each city's distribution system is also being performed with the <br />results being incorporated into the initial pricing structure for the merged utility operation. The goal is development of 0 <br />unified rate structure equalized over 0 seven to ten year period. <br /> <br />. Fort Smith Water and Wastewater Pricing Structure, Ft. Smith, AR; Senior Consultant. Developed and implemented a water <br />and wastewater cost based pricing structure on a regional utility basis from the owner/ customer basis used historically. <br />Worked with 0 customer advisory group composed of retail and wholesale customers during the entire study. <br /> <br />. Arkansas Parks Program Management, Little Rock, AR; Senior Consultant. In conjunction with the Program Management <br />Services of the $180 million CIP, provided consulting related to Fixed Capitol Asset Determination for GASB 34 Compliance. <br /> <br />. Hot Springs Water and Wastewater Pricing Structure, Hot Springs, AR; Project Manager. Currently developing a cost based <br />water and wastewater pricing structure on 0 regional basis for retail and wholesale customers of Hot Springs, Arkansas. The <br />city currently has a non-cost based pricing structure. <br /> <br />. Dallas Water Utilities (DWU) Retail Water Rote Study, Dallas, TX; Project Manager. Preparing rotes study for retail water <br />service, including 0 depreciation analysis of infrastructure assets and development of woter supply. <br /> <br />. Utility Rote Analysis for Metropolitan Government of Nashville and Davidson County, Deportment of Water and Sewerage, <br />Nashville, TN; Project Manager. Managed 0 financial analysis and prospective financial impact study related to a revenue <br />bond debt refunding for the Deportment. Managed wholesale wastewater, wastewater surcharge studies for the Department. <br /> <br />. Water and Sewer Rote Study, City of Whitehouse, Texas; - Developed revenue requirements in order to complete Water and <br />Sewer Rote Study. Also designed proposed rate structures. <br /> <br />. Utility Rote Study, Allen, TX; Project Manager. Performed cost of service water and wastewater rate study. Examined <br />revenue requirements and designed rates. <br /> <br />. Utility Rote Study; Lewisville, TX; Project Manager. Performed water and wastewater rote study, Examined revenue <br />requirements and designed rates. <br /> <br />. Utility Rote Study; Fort Worth, TX; Project Manager. As a member of 0 team prepared water and wholesale wastewater rate <br />studies. <br /> <br />. Acton MUD Water Rote Study; Granhury, TX; Project Manager. Developed cost of service rote study and designed water rotes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.