My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Grand Theater Hazardous Materials Remediation Phase I Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
18-Grand Theater Hazardous Materials Remediation Phase I Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 5:17:40 PM
Creation date
5/5/2011 5:17:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Scope of Work - Asbestos Abatement Irerracon <br /> Grand Theatre e 21 Lamar Avenue, Paris, Texas <br /> April 14, 2011 ® T erracon Project No. 94107645 <br /> <br /> Work Area from Changing Room is through Shower Room. Separate Changing Room <br /> from the building by a sheet polyethylene flapped doorway. <br /> <br /> Maintain floor of changing room dry and clean at all times. Do not allow overflow water <br /> from shower to wet floor in changing room. Damp wipe all surfaces twice after each shift <br /> change with a disinfectant solution. <br /> <br /> Provide a continuously adequate supply of disposable bath towels. <br /> Provide posted information for all emergency phone numbers and procedures. <br /> <br /> Shower Room: Provide a completely water tight operational shower to be used for transit <br /> by cleanly dressed workers entering the Work Area from the Changing Room, or for <br /> showering by workers exiting the Work Area after undressing in the Equipment Room. <br /> Construct room by providing a shower pan and 2 shower walls in a configuration that will <br /> cause water running down walls to drip into pan. Install a freely draining floor in the <br /> <br /> shower pan at an elevation that is at the top of pan. <br /> <br /> Separate this room from the rest of the building with airtight walls fabricated of 6 mil <br /> polyethylene sheeting. <br /> <br /> Separate this room from the Changing and Equipment Rooms with airtight walls <br /> fabricated of 6 mil polyethylene sheeting. <br /> <br /> Provide splash-proof entrances to Changing and Equipment Rooms with 2 doors <br /> arranged in the following configuration: <br /> <br /> At each entrance to the Shower Room construct a doorframe out of lumber, PVC Pipe or <br /> equivalent. Attach to this door frame two overlapping flaps fastened at the head (top) <br /> and jambs (sides). Overlap the flaps that present a shingle-like configuration to the water <br /> stream from the shower. Arrange so that any air movement out of the Work Area will <br /> cause the flaps to seal against the door frame. <br /> <br /> <br /> Provide shower head and controls. Provide temporary extensions of existing hot and <br /> cold water and drainage, as necessary for a complete and operable shower. <br /> Provide a continuously adequate supply of soap and maintain in sanitary condition. <br /> Arrange so that water from showering does not splash into the Changing or Equipment <br /> Rooms. <br /> <br /> Provide flexible hose showerhead. Pump wastewater to drain or to storage for use in <br /> amended water. If pumped to drain, provide 20 micron and 5 micron waste water filters <br /> in line to drain or waste water storage. Change filters daily or more often if nece ary. <br /> Provide- Hose Bib. <br /> <br /> <br /> <br /> <br /> 130 J_~~ 201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.