<br /> <br /> <br /> Scope of Work - Asbestos Abatement Merracon <br /> Grand Theatre e 21 Lamar Avenue, Paris, Texas <br /> April 14, 2011 a Terracon Project No. 94107645 <br /> Equipment Room (contaminated area): Require- work equipment, footwear and <br /> <br /> additional contaminated work clothing to be left here. This is a change and transit area <br /> for workers. Separate this room from the work area by a 6 mil polyethylene flap <br /> doorway. Separate this room from the rest of the building with airtight walls fabricated of <br /> 6 mil polyethylene sheeting. Separate this room from the Shower Room and Work Area <br /> with airtight walls fabricated of 6 mil polyethylene sheeting. <br /> <br /> Work Area: Separate work area from the Equipment Room by polyethylene barriers. If <br /> the airborne asbestos level in the work area is expected to be high, as in dry removal, <br /> add an intermediate cleaning space between the Equipment room and the Work area. <br /> Damp wipe clean all surfaces after each shift change. Provide one additional floor layer <br /> of 6 mil polyethylene sheeting per shift change and remove contaminated layer after <br /> each shift. <br /> <br /> Waste Load Out Area: the CONTRACTOR will conduct the waste load out in areas <br /> separate from any non-project personnel or passers-by. <br /> <br /> <br /> 3.4 Removal <br /> <br /> The CONTRACTOR will perform the removal and disposal in accordance with current <br /> local, state and federal regulations. <br /> <br /> Texture associated with Wall Plaster: Spray asbestos containing material(s) with <br /> amended water or removal encapsulant. Allow time for amended water or removal <br /> encapsulant to saturate the material. Do not over saturate to cause excess dripping. If <br /> amended water is used, spray material repeatedly during the work process to maintain a <br /> continuously wet condition. The textured wall plaster will be removed, exposing the brick <br /> substrate. The clean surfaces will be encapsulated after passing a visual inspection <br /> conducted by a Terracon representative. The abated material will be bagged and <br /> <br /> disposed of in accordance with the asbestos abatement design. <br /> <br /> Floor Tile/Mastic (interior/exterior): Spray asbestos containing flooring/mastic with <br /> amended water or removal encapsulant. Allow time for amended water or removal <br /> encapsulant to saturate the material. Do not over saturate to cause excess dripping. <br /> The flooring/mastic will be removed from the substrate. Once the flooring is removed the <br /> mastic remover may be applied to the floor mastic remaining on the substrate (where <br /> applicable). If mastic remover is used it will have a flash point greater than 140 degrees <br /> Fahrenheit. The mastic will be removed using a mopping action or with the use of low <br /> speed buffers. The clean surfaces will be encapsulated after passing a visual inspection <br /> conducted by a Terracon representative. The abated material will be bagged and <br /> disposed in accordance with the asbestcs abatement design. <br /> <br /> <br /> <br /> i;v <br /> <br /> <br /> - 131 <br />