3.3. Notice W Prnceed. The Contcactor will begin work within ten (10) days of the issuance of the Notice to <br />Proceed (unless otherwise stipulated). <br />3.4. The number of work days must be set aut in the contract. <br />3.5. Upon completion of the work and acceptance by the Contract Administtator and the homeowner, the <br />Certificate of Final Inspcction and Verification is issued and the Wetranty Period begins, <br />3.6. Thirty (30) days aRer the issuance of the Final Inspectioa end Verification, all retainage is released to the <br />Contractor, execpt in cases where it is determined that the retainege should not be released. <br />3.7. Compensation <br />A. PaYments are made when the project reaches 4Q"/o, 70%, end 100% completion and at thirty (30) <br />days after the Final InspecNon and VeriScation is issued. <br />3.8. All request for payments wi]I be made as follows: <br />A. The Contractor will submit in writing to the Contract Administrator, a list of items, their costa, and <br />a sum of the item costs for work to be paid. This will bo based on conep/eted itenia nnly from the <br />schedule of values submitted by the Contractor prior to construction, or the Itemization of Bid <br />Form if no schedule is submitted. <br />B. The Contract Administrator will inspect such work as eoon as possible (usuatly within one (1) <br />business day) from receipt of such request by the Cflntractor. <br />C. The Contract Administrator wil] provide a completed Progress Payment form for signature to the <br />Contractor for work for which payment is authorizcd, <br />D. The Contract Administrator will then request the homeowner to executc the Progress Payment <br />form. <br />E. The Contract Administrator wil1 normally pay the Contractor within ten (10) calendar days from <br />thc date of the owner's signaturo. Payment will be issued based on the Contract Administrator's <br />Financial Departmont's pay day schedule. <br />3.9. All work must be done with skilled craftsmen and accomplished with care. <br />3.10. All materials used must be new (unleas otherwiso specified in the Project manual) and of a good qualiry. <br />3.11. Product Submittals - contractor must provide samples to the Homeowner for Belection for ail materiale as <br />cited in the individual specifications and provido reasflnable time to the homeowner to make selecbons <br />Contractor must provide written submittal with the homeowner`s signawrc of apprnval to the Contract <br />Administrator. Items to be submitted for approval: paint, flooring materiels, brick, shingles, color of vinyl <br />siding, counter tops, appliances or any other item which can be sclected accord;ng to style, color or other <br />factor but not affecting the price or quality of such item. <br />4.0 Project Cloec-Ont <br />4.1. Cleaning: Remove all construction debris from the site. Clean aad mop all resilient floors. Clean all new <br />and existing paint from other finished sorfaces including window glass and mirrors. <br />4.2. Qperating Items: Leave all newly instatled items in operating condition. Light gas water heater pilots and <br />gas heater pilots. Start all systems. <br />4.3. Prepaiation of Structune: Prepare structwe for homeowner's occupancy. <br />TDHCA - HOME Inveshnent Partrietships Prograrn <br />Appaidix A-04 - TMC Specifications Page 2 of 24 Revisod OU01/2004 <br />" 213 <br />