My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
include the name of the laboratory that will do the blood lead testing and the <br />name and location of the laboratory that will test the personnel air monitors for <br />exposure assessment. The Plan must also address required training and <br />Certification of such training for all workers and the competent person. <br />4. Disposal of Debris Program: The Contractor will submit a written plan <br />detailing the procedures used to properly handle, store and test debris to <br />determine if it is hazardous. In addition, the program must identify the license <br />number of transporters and disposal facilities to be employed. The written <br />program must also explain how manifesting will be addressed. <br />5. TCEQ Notification: Contractor shall notify in writing the appropriate <br />TACB regional office and any local authorities having jurisdiction over <br />abrasive blasting activities of the blasting in writing in accordance with TCEQ <br />Rule 111.135. Prior to notification, contractor shall submit a copv to the <br />Engineer for approval. Per Rule 111.135, the notification must include: <br />(1) the location of the tank; <br />(2) the name of the abrasive blasting company; <br />(3) the weight percent of lead in the coating; <br />(4) the control methods to be used; and <br />(5) the expected hours of operation and scheduled start and finish dates. <br />TS35-8 4s9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.