My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 "T" Hangar Specs--Previous
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
06 - June
>
June 28, 2001
>
02 "T" Hangar Specs--Previous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:16:53 AM
Creation date
6/25/2001 3:42:59 PM
Metadata
Fields
Template:
AGENDA
Item Number
02
AGENDA - Type
PLANS & SPECIFICATIONS
Description
"T" Hangar Specifications
AGENDA - Date
4/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.3 MEASUREMENT AND PAYMENT <br />Clearing and grubbing shall be measured for <br />payment either in acres or by lump sum. <br />Measurement for payment shall be made only on <br />areas indicated and classified on plans as <br />clearing and grubbing. Clearing and grubbing <br />shall be paid for at the contract unit price <br />per acre or at the lump sum price, as the case <br />may be, as provided in the proposal and <br />contract. The contract unit price shall be <br />the total compensation for furnishing all <br />materials, labor, equipment, tools and <br />incidentals necessary to complete the work, <br />all in accordance with the plans and these <br />specifications. When not listed as a separate <br />contract pay item, clearing and grubbing shall <br />be considered as incidental work, and the cost <br />thereof shall be included in such contract pay <br />items as are provided for in the proposal <br />contract. <br />2.2 UNDERGROUND CONDUIT CONSTRUCTION <br />2.2.1 DESCRIPTION <br />This part of the specifications shall govern <br />for construction of all types of sewer and <br />water structures except where the requirements <br />are revised by another governing <br />specification. All structures shall be <br />constructed in accordance with the design <br />requirements and with the details shown on the <br />plans; and in conformity with the requirements <br />herein provided. Other applicable sections or <br />parts of these specifications shall govern for <br />such miscellaneous and incidental construction <br />necessary to complete the work in accordance <br />with the plans and specifications. <br />2.2.2 MATERIALS <br />Al1 materials used in the construction of work <br />specified in this division shall conform to <br />the applicable sections of Division I of these <br />specifications and approved by the OWNER. Any <br />materials placed before approval of the OWNER <br />shall be removed, if directed by the OWNER, <br />and replace with approved materials. <br />80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.