My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatreâ– 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />p) CONTRACTOR will include the cost of the TDSHS notification fee in their base <br />bid. <br />q) AIA Contract A-101 2007 will be used for this project as the contract with the <br />owner. Supplementary Condition to the Standard Form of Agreement Between <br />Owner and CONTRACTOR. <br />3.0 WORK PRACTICES <br />3.1 Respiratory Protection <br />Throughout the project, respirators shall be provided by the CONTRACTOR. The <br />CONTRACTOR will provide respirators which are applicable and suitable for the <br />purpose intended in accordance with OSHA 1910.134 - Respirator Standard. The <br />CONTRACTOR will ensure that the respirators are equipped with filter cartridges <br />designed for asbestos-containing dusts and mists, vapors, and color-coded in <br />accordance with ANSI Z228.2 (1980). <br />3.2 Protective Clothing <br />During removal of the ACM, at least one protective suit will be worn by each worker. <br />Boots and gloves will be made available to each worker as needed. All protective suits <br />will be properly disposed of at the conclusion of the work. The workers performing the <br />abatement will decontaminate thoroughly in three-chambered wet decontamination <br />system attached to each containment. <br />3.3 Containment <br />The asbestos containing materials will be abated in a full containment constructed of two <br />(2) layers of 4-mil polyethylene sheeting on the walls and two (2) layers of 6-mil <br />polyethylene sheeting on the floors (where applicable), and one layer of 4-mil <br />polyethylene sheeting on the ceiling, in conjunction with critical barriers, negative <br />pressure, and a three chambered wet decontamination system. <br />Decontamination System: disposable/pop-up units displaying excessive use or <br />wear will not be permitted for the decontamination system. Provide a Personnel <br />Decontamination Unit consisting of a serial arrangement of connected rooms or spaces, <br />Changing Room, Shower Room, and Equipment Room. Require all persons without <br />exception to pass through this decontamination unit for entry into and exiting from the <br />work area for any purpose. Do not allow parallel routes for entry or exit. / <br />Chanqinq Room (clean room): Provide a room that is physically and vAsyfally/separated <br />rcye rrougns <br />TDSHS ice e # 0-5095 <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.