My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatreâ– 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />from the rest of the building for the purpose of changing into protective ciothing. <br />Construct using polyethylene sheeting, at least 6-mil in thickness, to provide an airtight <br />seal between the Changing Room and the rest of the building. Locate so that access to <br />Work Area from Changing Room is through Shower Room. Separate Changing Room <br />from the building by a sheet polyethylene flapped doorway. <br />Maintain floor of changing room dry and clean at all times. Do not allow overflow water <br />from shower to wet floor in changing room. Damp wipe all surfaces twice after each shift <br />change with a disinfectant solution. <br />Provide a continuously adequate supply of disposable bath towels. <br />Provide posted information for all emergency phone numbers and procedures. <br />Shower Room: Provide a completely water tight operational shower to be used for transit <br />by cleanly dressed workers entering the Work Area from the Changing Room, or for <br />showering by workers exiting the Work Area after undressing in the Equipment Room. <br />Construct room by providing a shower pan and 2 shower walls in a configuration that will <br />cause water running down walls to drip into pan. Install a freely draining floor in the <br />shower pan at an elevation that is at the top of pan. <br />Separate this room from the rest of the building with airtight walls fabricated of 6 mil <br />polyethylene sheeting. <br />Separate this room from the Changing and Equipment Rooms with airtight walls <br />fabricated of 6 mil polyethylene sheeting. <br />Provide splash-proof entrances to Changing and Equipment Rooms with 2 doors <br />arranged in the following configuration: <br />At each entrance to the Shower Room construct a doorframe out of lumber, PVC Pipe or <br />equivalent. Attach to this door frame two overlapping flaps fastened at the head (top) <br />and jambs (sides). Overlap the flaps that present a shingle-like configuration to the water <br />stream from the shower. Arrange so that any air movement out of the Work Area will <br />cause the flaps to seal against the door frame. <br />Provide shower head and controls. Provide temporary extensions of existing hot and <br />cold water and drainage, as necessary for a complete and operable shower. <br />Provide a continuously adequate supply of soap and maintain in sanitary condition. <br />Arrange so that water from showering does not splash into the Changing or Equipment <br />Rooms. / <br />Provide flexible hose showerhead. Pump wastewater to drain or to storag r use in <br />amended water. If pumped to drain, provide 20 micron and 5 micron-w-N44 ater filters <br />TDSHS Li~n e # : 5095 <br />Expiration at 09.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.