Laserfiche WebLink
Phase II - Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatreâ–  21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />in line to drain or waste water storage. Change filters daily or more often if necessary. <br />Provide Hose Bib. <br />Equipment Room (contaminated area): Require work equipment, footwear and <br />additional contaminated work clothing to be left here. This is a change and transit area <br />for workers. Separate this room from the work area by a 6 mil polyethylene flap <br />doorway. Separate this room from the rest of the building with airtight walls fabricated of <br />6 mil polyethylene sheeting. Separate this room from the Shower Room and Work Area <br />with airtight walls fabricated of 6 mil polyethylene sheeting. <br />Work Area: Separate work area from the Equipment Room by polyethylene barriers. If <br />the airborne asbestos level in the work area is expected to be high, as in dry removal, <br />add an intermediate cleaning space between the Equipment room and the Work area. <br />Damp wipe clean all surfaces after each shift change. Provide one additional floor layer <br />of 6 mil polyethylene sheeting per shift change and remove contaminated layer after <br />each shift. <br />Waste Load Out Area: the CONTRACTOR will conduct the waste load out in areas <br />separate from any non-project personnel or passers-by. <br />3.4 Removal <br />The CONTRACTOR will perform the removal and disposal in accordance with current <br />local, state and federal regulations. <br />Acoustical Ceilinq Texture: acoustical ceiling texture will be removed in a full <br />containment. Spray asbestos containing material(s) with amended water or removal <br />encapsulant. Allow time for amended water or removal encapsulant to saturate the <br />material. Do not over saturate to cause excess dripping. If amended water is used, <br />spray material repeatedly during the work process to maintain a continuously wet <br />condition. The acoustical texture will be removed from the plaster substrate. The clean <br />surfaces will be encapsulated after passing a visual inspection conducted by a Terracon <br />representative. The abated material will be bagged and disposed of in accordance with <br />the asbestos abatement design. <br />Floor Tile/Mastic : floor tile/mastic will be removed in a full containment. Spray <br />asbestos containing flooring/mastic with amended water or removal encapsulant. Allow <br />time for amended water or removal encapsulant to saturate the material. Do not over <br />saturate to cause excess dripping. The flooring/mastic will be removed from the <br />substrate. Once the flooring is removed the mastic remover may be applied to the floor <br />mastic remaining on the substrate (where applicable). If mastic remover is use will <br />have a flash point greater than 140 degrees Fahrenheit. The masticswillAhe moved <br />~yl B rroughs <br />TDSHS Lic ns # 0-5095 <br />Expiration ate. 02.09.13 <br />