My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatreâ– 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />in line to drain or waste water storage. Change filters daily or more often if necessary. <br />Provide Hose Bib. <br />Equipment Room (contaminated area): Require work equipment, footwear and <br />additional contaminated work clothing to be left here. This is a change and transit area <br />for workers. Separate this room from the work area by a 6 mil polyethylene flap <br />doorway. Separate this room from the rest of the building with airtight walls fabricated of <br />6 mil polyethylene sheeting. Separate this room from the Shower Room and Work Area <br />with airtight walls fabricated of 6 mil polyethylene sheeting. <br />Work Area: Separate work area from the Equipment Room by polyethylene barriers. If <br />the airborne asbestos level in the work area is expected to be high, as in dry removal, <br />add an intermediate cleaning space between the Equipment room and the Work area. <br />Damp wipe clean all surfaces after each shift change. Provide one additional floor layer <br />of 6 mil polyethylene sheeting per shift change and remove contaminated layer after <br />each shift. <br />Waste Load Out Area: the CONTRACTOR will conduct the waste load out in areas <br />separate from any non-project personnel or passers-by. <br />3.4 Removal <br />The CONTRACTOR will perform the removal and disposal in accordance with current <br />local, state and federal regulations. <br />Acoustical Ceilinq Texture: acoustical ceiling texture will be removed in a full <br />containment. Spray asbestos containing material(s) with amended water or removal <br />encapsulant. Allow time for amended water or removal encapsulant to saturate the <br />material. Do not over saturate to cause excess dripping. If amended water is used, <br />spray material repeatedly during the work process to maintain a continuously wet <br />condition. The acoustical texture will be removed from the plaster substrate. The clean <br />surfaces will be encapsulated after passing a visual inspection conducted by a Terracon <br />representative. The abated material will be bagged and disposed of in accordance with <br />the asbestos abatement design. <br />Floor Tile/Mastic : floor tile/mastic will be removed in a full containment. Spray <br />asbestos containing flooring/mastic with amended water or removal encapsulant. Allow <br />time for amended water or removal encapsulant to saturate the material. Do not over <br />saturate to cause excess dripping. The flooring/mastic will be removed from the <br />substrate. Once the flooring is removed the mastic remover may be applied to the floor <br />mastic remaining on the substrate (where applicable). If mastic remover is use will <br />have a flash point greater than 140 degrees Fahrenheit. The masticswillAhe moved <br />~yl B rroughs <br />TDSHS Lic ns # 0-5095 <br />Expiration ate. 02.09.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.