Laserfiche WebLink
Phase II - Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatreâ–  21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />(ASBESTOS) <br />Polvethvlene Wrap: Provide minimum 6 mil polyethylene sheeting as a wrapping for <br />large sections of rigid waste material and for construction of floors and critical barriers in <br />the containment areas. Provide minimum 4 mil polyethylene sheeting for construction of <br />walls of the containment. <br />Removal Encapsulant: Provide a penetrating type encapsulant designed specifically for <br />removal of ACM. Utilize an encapsulant that will meet or exceed the results produced by <br />use of Amended Water, as described above. <br />7.0 AIR MONITORING SERVICES <br />The responsibility for performing visual inspections and air monitoring services is <br />delegated to Terracon's on-site State of Texas licensed project manager/air monitoring <br />technician. <br />The CONSULTANT shall verify that the Work performed is in compliance with applicable <br />regulations and that the building areas beyond the Work Area and the outside <br />environment remain free of contamination. This section also sets forth airborne fiber <br />levels both inside and outside the Work Area as permissible exposure limits (PELs), and <br />describes the action required by the CONTRACTOR if a permissible exposure limit is <br />met or exceeded. <br />AIR MONITORING: <br />The CONSULTANT will be conducting air monitoring throughout the course of the <br />project. <br />Work Area Isolation: The CONSULTANT will monitor airborne fiber counts outside the <br />Work Area. The purpose of this air monitoring will be to detect faults in the Work Area <br />isolation including, but not limited to, contamination of the building outside of the Work <br />Area with airborne asbestos fibers, failure of filtration or rupture in the ventilation system, <br />or contamination of the exterior of the building with airborne asbestos fibers. <br />Should any of the above occur, the CONTRACTOR shall immediately cease asbestos <br />abatement activities until the fault is corrected. Work shall not recommence until <br />authorized by the CONSULTANT. <br />Work Area Airborne Fiber Count: The CONSULTANT will monitor airborne fiber counts <br />in the Work Area. The purpose of this air monitoring will be to detect airborne fiber <br />counts which may significantly challenge the integrity of Work Area isolation proce <br />,dures <br />ly urroughs <br />TDSHS Lic n 0-5095 <br />Expiration Date..09.13 <br />