My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatreâ– 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />(ASBESTOS) <br />Polvethvlene Wrap: Provide minimum 6 mil polyethylene sheeting as a wrapping for <br />large sections of rigid waste material and for construction of floors and critical barriers in <br />the containment areas. Provide minimum 4 mil polyethylene sheeting for construction of <br />walls of the containment. <br />Removal Encapsulant: Provide a penetrating type encapsulant designed specifically for <br />removal of ACM. Utilize an encapsulant that will meet or exceed the results produced by <br />use of Amended Water, as described above. <br />7.0 AIR MONITORING SERVICES <br />The responsibility for performing visual inspections and air monitoring services is <br />delegated to Terracon's on-site State of Texas licensed project manager/air monitoring <br />technician. <br />The CONSULTANT shall verify that the Work performed is in compliance with applicable <br />regulations and that the building areas beyond the Work Area and the outside <br />environment remain free of contamination. This section also sets forth airborne fiber <br />levels both inside and outside the Work Area as permissible exposure limits (PELs), and <br />describes the action required by the CONTRACTOR if a permissible exposure limit is <br />met or exceeded. <br />AIR MONITORING: <br />The CONSULTANT will be conducting air monitoring throughout the course of the <br />project. <br />Work Area Isolation: The CONSULTANT will monitor airborne fiber counts outside the <br />Work Area. The purpose of this air monitoring will be to detect faults in the Work Area <br />isolation including, but not limited to, contamination of the building outside of the Work <br />Area with airborne asbestos fibers, failure of filtration or rupture in the ventilation system, <br />or contamination of the exterior of the building with airborne asbestos fibers. <br />Should any of the above occur, the CONTRACTOR shall immediately cease asbestos <br />abatement activities until the fault is corrected. Work shall not recommence until <br />authorized by the CONSULTANT. <br />Work Area Airborne Fiber Count: The CONSULTANT will monitor airborne fiber counts <br />in the Work Area. The purpose of this air monitoring will be to detect airborne fiber <br />counts which may significantly challenge the integrity of Work Area isolation proce <br />,dures <br />ly urroughs <br />TDSHS Lic n 0-5095 <br />Expiration Date..09.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.