Laserfiche WebLink
Phase II - Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatreâ–  21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />Base Line Sample Schedule: The CONSULTANT will secure the following air samples <br />to establish a Base Line before start of Work. The number of samples may vary <br />according to site plan and on authorization of CONSULTANT. <br />~Locatioa~m~pled~~ <br />~ M~~m pu~mi Nu~mb'~er~ <br />in ` ua ple <br />lan ed °`"`~lyt ~al~° <br />'~~K~ <br />ry <br />~ <br />~ <br />~ olur~ <br /> <br />Method. <br /> <br />Each WorkArea <br />3 <br />1,250 Liters <br />PCM <br />Daily Sample Schedule (per 8-hour work period): The CONSULTANT will generally take <br />the following samples on a daily (8-hour work period) basis. The number of samples <br />may vary according to site plan and on authorization of CONSULTANT. <br />Locat onkSampled ~ <br />A <br />Minimum Number~~ <br />*,ll*,nU.Mk " a <br />e <br /> <br />k"Panne ~nalytical <br />~ <br />oSa <br />olum <br />Method~ <br />~ <br />' <br /> <br />.~.~t.,., . <br />Each Work Area <br />1 <br />500 Liters <br />PCM <br />Outside Each Work <br />1 <br />500 Liters <br />PCM <br />Area/Inside Building <br />Decon Unit Clean <br />1 <br />500 Liters <br />PCM <br />Room <br />Output of Negative <br />Pressure Ventilation <br />1 <br />500 Liters <br />PCM <br />System <br />Clearance Sample Schedule: The CONSULTANT will secure the following air samples <br />to determine air clearance at the conclusion of abatement. The number of samples may <br />vary according to site plan and on authorization of CONSULTANT. <br />Nd <br />Mirn <br />uumber~ y <br />Min~n <br />i um< <br />Sa <br />F~tgpn <br />anne `Anal ical <br />.q <br />'.~'~;y- <br />ofSamples* <br />u <br />Method ~ <br />Each WorkArea <br />3 <br />1,250 Liters <br />PCM <br />Clearance will be achieved if each air sample is analyzed and determined to be <br />less than 0.01 fibers per cubic centimeter of air by the on-site analyst. <br />The CONSULTANT, in addition to providing air monitoring services, will provide full- <br />time, on-site inspection of work activities. Work shall not proceed without prior notice to <br />the CONSULTANT and presence of the CONSULTANT on the work site (requires 48 <br />hours advance notice of work). <br />le roughs <br />TDSHS Li #1 5095 <br />Expiration ate: 02.09.13 <br />