My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - Scope of Work - Lead Paint Abatement Irerracon <br />Grand Theatre ■ 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 ■ Terracon Project No. 94107645 <br />form fall hazards. Fall protections protocols must comply with all applicable <br />provision of OSHA 29 CFR 1926.500, SUBPART L. Documentation of training for <br />each employee will be provided prior to beginning work. <br />i) CONTRACTOR will be responsible for the cleaning/decontamination of identified <br />items which the Owner intends to save due to their historical significance. Once <br />these items are cleaned they will be stored in a designated area provided by the <br />Owner. These items will be identified by the Consultant prior to beginning <br />remediation. <br />j) Remaining equipment, fixtures and items in the proposed works area are <br />considered contaminated and will be disposed of asbestos waste or lead waste. <br />k) CONTRACTOR will provide a continuous fire watch whenever an active <br />containment is in operation. <br />I) Drawings provided depict the generat locations of the identified lead containing <br />paint to be remediated. The drawings show the basic configuration or general <br />locations of the lead containing paint and are provided for informational <br />purposes. The CONTRACTOR will perform work for materials present, <br />regardless of actual quantities, extent of materials, even if the item is not <br />depicted on the drawings. No increase in Contract amount will be allowed for <br />quantity adjustment. <br />m) Owner will provide sources of power and water for the project, it will be the <br />CONTRACTOR's responsibility to route each to the area of usage at the <br />CONTRACTOR's expense. <br />n) CONTRACTOR's fee will include the cost of the electrician/plumber expense for <br />abatement area "make safe." <br />3.0 WORK PRACTICES <br />3.1 Respiratory Protection <br />Throughout the project, respirators shall be provided by the Contractor. The Contractor <br />will provide respirators which are applicable and suitable for the purpose intended in <br />accordance with OSHA 1910.134 - Respirator Standard. The Contractor will ensure <br />that the respirators are equipped with filter cartridges designed for lead paint, dusts and <br />mists, vapors, and color-coded in accordance with ANSI Z228.2 (1980). <br />3.2 Protective Clothing <br />During removal of the loose and flaking LBP, at least one protective suit will be worn by <br />Responsive ■ Resoueceful■ Reliable 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.