My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - Scope of Work - Lead Paint Abatement Irerracon <br />Grand Theatre ■ 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 ■ Terracon Project No. 94107645 <br />At completion of abatement work, allow exhaust units to run to remove lead dust that may <br />have been generated during abatement work and cleanup and to purge the Work Area <br />with clean makeup air. <br />Dismantling the System: <br />When a final inspection and the results of final testing indicates that the area has been <br />decontaminated, exhaust units may be removed from the Work Area. Before removal <br />from the Work Area, remove and properly dispose of prefilter, and seal intake to the <br />machine with 6 mil polyethylene to prevent environmental contamination from the filters. <br />Extension of the Work Area: <br />If the containment barrier is breached in any manner that could allow the passage of lead <br />debris or airborne lead, then add affected area to the Work Area. Provide temporary <br />containment as required in accordance with this scope of work. <br />Additional Containment Requirements: <br />Stairs and Ramps: Do not cover stairs or ramps with unsecured sheet plastic. Where <br />stairs or ramps are covered with plastic, provide treads securely held in place, over <br />plastic. Do not cover rungs or rails with any type of protective materials. <br />Scaffolding inside the Work Area: Cover containment floor plastic with a plywood or <br />hardboard of sufficient thickness to protect plastic from punctures and tears. Wrap edges <br />and corner of each sheet with adhesive tape. At completion of abatement work, wrap <br />plywood or hardboard with two (2) layers of 6 mil polyethylene and move to next Work <br />Area or dispose of as lead-contaminated waste in accordance with Section 02080.24. <br />Containment constructed on Scaffolding Deck: Cover deck (floor) of scaffolding with the <br />following layers as a minimum: One layer of 10 mil thick, clear, reinforced, polyethylene <br />sheeting as bottom layer, turned up walls at least fourteen inches (14"). One layer of <br />corrugated cardboard over bottom layer. Follow with two individual layers of 6 mil thick <br />clear polyethylene, installed in same manner as Primary and Secondary Barriers for <br />floors. Install Drop Cloth as final layer. Proceed with installation of wall barriers for the <br />type of containment construction required. <br />3.4 Removal <br />The CONTRACTOR will perform the removal and disposal of the damaged flaking paint <br />in accordance with current applicable local, state and federal regulations. The Contractor <br />will minimize the creation of lead contaminated dust and airborne particles using <br />methods and procedures that create the least amount of dust. <br />Responsive ■ Resourceful■ Reliable 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.