Phase II - Scope of Work - Lead Paint Abatement Irerracon <br />Grand Theatre ■ 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 ■ Terracon Project No. 94107645 <br />At completion of abatement work, allow exhaust units to run to remove lead dust that may <br />have been generated during abatement work and cleanup and to purge the Work Area <br />with clean makeup air. <br />Dismantling the System: <br />When a final inspection and the results of final testing indicates that the area has been <br />decontaminated, exhaust units may be removed from the Work Area. Before removal <br />from the Work Area, remove and properly dispose of prefilter, and seal intake to the <br />machine with 6 mil polyethylene to prevent environmental contamination from the filters. <br />Extension of the Work Area: <br />If the containment barrier is breached in any manner that could allow the passage of lead <br />debris or airborne lead, then add affected area to the Work Area. Provide temporary <br />containment as required in accordance with this scope of work. <br />Additional Containment Requirements: <br />Stairs and Ramps: Do not cover stairs or ramps with unsecured sheet plastic. Where <br />stairs or ramps are covered with plastic, provide treads securely held in place, over <br />plastic. Do not cover rungs or rails with any type of protective materials. <br />Scaffolding inside the Work Area: Cover containment floor plastic with a plywood or <br />hardboard of sufficient thickness to protect plastic from punctures and tears. Wrap edges <br />and corner of each sheet with adhesive tape. At completion of abatement work, wrap <br />plywood or hardboard with two (2) layers of 6 mil polyethylene and move to next Work <br />Area or dispose of as lead-contaminated waste in accordance with Section 02080.24. <br />Containment constructed on Scaffolding Deck: Cover deck (floor) of scaffolding with the <br />following layers as a minimum: One layer of 10 mil thick, clear, reinforced, polyethylene <br />sheeting as bottom layer, turned up walls at least fourteen inches (14"). One layer of <br />corrugated cardboard over bottom layer. Follow with two individual layers of 6 mil thick <br />clear polyethylene, installed in same manner as Primary and Secondary Barriers for <br />floors. Install Drop Cloth as final layer. Proceed with installation of wall barriers for the <br />type of containment construction required. <br />3.4 Removal <br />The CONTRACTOR will perform the removal and disposal of the damaged flaking paint <br />in accordance with current applicable local, state and federal regulations. The Contractor <br />will minimize the creation of lead contaminated dust and airborne particles using <br />methods and procedures that create the least amount of dust. <br />Responsive ■ Resourceful■ Reliable 8 <br />