My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2060 RES CITY COUNCIL AT REGULAR MEETING ON 8TH DAY OF SEPTEMBER 1980 APROVED ADVERTISEMENT FOR BIDS
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1980
>
2060 RES CITY COUNCIL AT REGULAR MEETING ON 8TH DAY OF SEPTEMBER 1980 APROVED ADVERTISEMENT FOR BIDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 9:05:14 AM
Creation date
7/27/2012 4:35:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
10/13/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC. 14 TRA;JE NAMES AND MATERIALS <br />No materials which have been used by the Contractar or others sha11 be <br />incorporated in the structure or improvemer.t. <br />Where the material is specified by a trade or brand name, it is not <br />the intention of the owner to discriminate against an EQUAL Product <br />of another manufacturer, but rather to set a definite standard <br />quality or performance, and to establish an equa2 basis for the <br />evaluation of Bids. <br />SC. 15 PROJECT MAINTENANCE <br />The Cantractar shall maintain and keep in good repair all work contem- <br />plated under this Contract, for the safe operations of the airport. <br />SC. 16 EXISTING STRUCTIJRES AND UTILITIES <br />The Plans show the location of all known surFace and subsurface <br />structures_ I3owever, the owner assumes no responsibility for failure <br />ta show a.rxy ar all of these structures on the Plans, or to show them <br />in their er.act location. <br />SC. 17 DISPOSAL OF hASTE OR SURPLliS EXCAVATTON <br />All surplus excavation, materials, and debris of the contractor's shall <br />be removed from the construction site and disposed of in a manner <br />approved by the Engineer. <br />SC. 18 GUARANTY AGAINST DEFECTIVE WORK <br />The Contractor shall furnish warranty in writing indemnifying the Owner <br />against any zepairs which may become necessary to any part of material <br />or construction arisin.g from defective workmanship, for a period of <br />cane (1) year from date o£ final acceptance of the entire project. <br />SC. 19 INSURANCE <br />The Contractor shall obtain, and maintain during the life of the Con- <br />tract, and provide copies to the owner, of the £ollowing insurance <br />policies which shall be obtained from the insurance company licensed to <br />do business z.n the State of Z'exas. Insurar.ce policie> shall be obtained <br />by the Contractor and approved by the owner prior to the commeneement <br />of the work. <br />(a) Gvorkmen's Compensation and Employer's Libaility Insurance <br />Workmen's Compensation and Employer's Liability Irisurance in the <br />amount and terms required by applicable st.atute for all_ employees <br />in work an the project under this contract, and in case of such <br />work sublet, the contractor shall reciuire the subcontractor <br />similiarly to provide Workmen`s Compensation Tnsurance f.or all the <br />latter`s employees to be engaged in such wcr}:. <br />SC- 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.