My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />SECTION 02100 SITE PREPARATION & EARTHWORK <br /> <br />SECTION 02100: SITE PREPARATION & EARTHWORK <br /> <br />PARTI-GENERAL <br /> <br />1.01 GENERAL CONDITIONS <br /> A. As specified in Divisions 00 and 01 apply to all work in this Section.. <br /> <br />1.02 DESCRIPTION OF WORK <br /> <br /> A. Furnish all labor, materials, tools and equipment necessary for excavation, filling, <br /> backfrlling, rough and finish grading, exterior trench excavation and backfill for <br /> utility lines, and relateditems necessary to complete all work shown on the Drawings <br /> and/or specified herein. <br /> <br />1.03 COORDINATION WITH OTHER SECTIONS <br /> <br /> A. Trenching and backfilling for interior utility lines up to a point five feet outside of building <br /> area are specified in Section 15010 - PLUMBING. <br /> <br /> B. Concrete work, electrical work, mechanical work, are specified in their respective sections. <br /> <br /> C. Soil poisoning is specified in Section 02281 - SOIL TREATMENT FOR TERMITE <br /> CONTROL. <br /> <br />1.04 ORDINANCES AND PERMITS <br /> <br /> A. The Contractor(s) shall comply with all applicable federal, state and local laws and <br /> ordinances and obtain the required permits. <br /> <br />1.05 EXISTING UTILITY LINES <br /> <br /> A. The existence of active and abandoned underground utility lines within the construction <br /> area is not definitively known other than those indicated in their approximate locations <br /> on the Drawings. Contractor(s) shall take all precautions and measures to locate lines <br /> before excavating. <br /> <br /> B. Should any unknown line be encountered during excavation, the Contractor(s) shall <br /> immediately notify the Construction Manager of such discovery. The Architect shall <br /> then investigate and issue instructions for the preservation or disposition of the <br /> unknown line. <br /> <br /> Section 02100 <br /> Page 14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.