My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />SECTION 02260 FINISH GRADING <br /> <br />SECTION 02260: FINISH GRADING <br /> <br />PART i - GENERAL <br /> <br />1.01 GENERAL REQUIREMENTS <br /> <br /> A. Furnish all labor, materials, tools and equipment necessary for finish grading onsite so <br /> as to yield a quality landscape-ready finish grade of topsoil, blending continuously with the <br /> surrounding land and carefully sloped so as to provide positive drainage away from the <br /> building and related items necessary to complete all work shown on the Drawings <br /> and/or specified herein. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 MATERIAL <br /> <br /> A. Asbestos Prohibition: No asbestos containing materials shall be used. The contractor <br /> shall insure that all materials incorporated in the project are asbestos-free. <br /> <br />2.02 SURFACE MATERIAL <br /> <br /> A. Imported topsoil or stockpiled topsoil material from grading operation at Conmtctor's <br /> option after approval by Engineer may be used for finished grading yard fill <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 FINISH GRADING <br /> <br /> A. Outdoor areas shall be graded to finish grades and contours carefully sloped so as to <br /> provide positive drainage away from the building in all areas within 45' of the <br /> building(s). <br /> <br /> B. Top soil finished grading shall not be installed until buildings, walks, and other site work <br /> are substantially completed. Rake and spread to finish grade which shall blend <br /> continuously with surrounding land and be carefully sloped to drain away from building. <br /> <br /> * * END OF SECTION * * <br /> <br /> Section 02260 <br /> Page 1-1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.