My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />SECTION 2500 CURBS, RAMPS, GUTTERS AND SIDEWALKS <br /> <br />SECTION 2500: CURBS, RAMPS, GUTTERS AND SIDEWALKS <br /> <br />PART 1 - GENERAL <br /> <br />1.01 GENERAL CONDITIONS <br /> <br /> A. As specified in Divisions 00 and 01 apply to all work in this Section.. <br /> <br />1.02 DESCRIPTION OF WORK <br /> <br /> A. Provide concrete walkways, ramps, curbs and gutters complete as indicated on the Drawings <br /> and as specified herein. <br /> <br />1.03 RELATED DOCUMENTS <br /> <br /> A. The General Provisions of the Contract, including General and Special Provisions and <br /> General Requirements of the PROJECT MANUAL, apply to the work specified in this <br /> Section. <br /> <br />1.04 GENERAL REQUIREMENTS <br /> <br /> A. The Public Works standards of the City of Paris, 1994 Southern Building Code, "Texas <br /> Accessibility Standards", including all revisions, shall govern all work except for the <br /> subsections on Measurement and Payment which shall not be applicable. <br /> <br />PART 2 PRODUCTS <br /> <br />2.01 MATERIALS <br /> <br /> A. Asbestos Prohibition: No asbestos containing materials shall be used under this section. <br /> The Contractor shall insure that all materials incorporated in the project are asbestos-free.. <br /> <br /> B. Materials for concrete curbs, gutters, and walkways shall be formulated to match original <br /> concrete walkways in color, texture and finish and shall be formulated in accordance with <br /> the standard specifications listed below. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 INSTALLATION <br /> <br /> A. The Contractor shall stake out areas of new walkways with final finish, base course and <br /> subgrade clearly marked. All such stakes shall be approved by Architect before work is <br /> continued. <br /> <br /> B. Concrete installation shall be in accordance with the applicable codes, regulations and <br /> standards. <br /> <br /> Section 02500 <br /> Page 1-2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.