Laserfiche WebLink
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br /> C. Color, texture, and finish is to match the original concrete. <br /> <br />3.02 FINAL INSPECTION <br /> <br /> A. At the time of final inspection of the work performed under the Contract, the work <br /> covered by this section shall be complete in every respect and operating as designed. <br /> All surplus materials of every character, resulting from the work of this section shall <br /> have been removed. Any defects discovered in the work, subsequent to this inspection, shall <br /> be corrected prior to final acceptance. <br /> <br /> * * END OF SECTION * * <br /> <br /> Section 02500 <br /> Page 2-2 <br /> <br /> <br />