My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHI'i-[CT£ <br /> July 10, 2001 <br /> <br />SECTION 04250 MASONRY CLEANING <br /> <br />SECTION 04250: MASONRY CLEANING <br /> <br />PART 1 - GENERAL <br /> <br />1.01 GENERAL CONDITIONS <br /> A. As specified in Divisions 00 and 01 apply to ail work in this Section.. <br /> <br />1.02 DESCRIIYrlON OF WORK <br /> <br /> A. Work Included: Masonry cleaning of discolored stone by use of a low pressure wash <br /> of distilled water and non-ionic detergents. Cleaning of graffiti disfigured masonry by <br /> use of organic and/or petroleum based solvent poultices. In all instances, high <br /> pressure washing, steam cleaning, chemicai cleaning, aerosol graffiti removers and <br /> mechanical cleaning methods are expressly forbidden. <br /> <br />1.03 TESTING & ANALYSIS: <br /> <br /> A. Field testing and adjustment of cleaning methodologies is required in order to <br /> achieve an aesthetically compatible and non-destructive cleaning system. <br /> This process is expected to require considerable triai and error in the way <br /> of preparation of multiple field samples and test patches. Contractor shall <br /> allot adequate time and resources to conduct this work. <br /> <br />1.04 SUBMITTALS: <br /> <br /> A. Submittal of manufacturer's literature for formulated graffiti removai products and <br /> commerciai paint strippers. <br /> <br /> B. Samples: Prepare field test patches for Architect's and Construction Manager's <br /> review of materials and application: <br /> <br /> Section 04250 <br /> Page 1-4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.