My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe~Frisco Depot Rehabilitation O KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />SECTION 07200 TILE ROOFING <br /> <br />SECTION 07200: TILE ROOFING <br /> <br />PART 1 - GENERAL <br /> <br />1.01 DESCRIFrlON OF WORK: <br /> <br /> A. Work Included: Repair and rehabilitation of existing file roofing to include, <br /> <br /> 1. Inspection of existing roofing tile and calculation of required replacement tile. <br /> 2. Removal, sorting, salvage and on-site storage of existing roofing tile. <br /> 3. Inspection and repair of roof substrate, sheathing as per Drawings and as <br /> indicated by inspection results. <br /> 4. Installation of all flashings and gutters (specified in Section 07600). <br /> 5. Installation of roofing felt. <br /> 6. Installation of asphaltic roll roofing. <br /> 7. Installation of salvaged original roofing file and replica roofing tile. <br /> 8. Repair of fiat file vertical cladding at donners, including partial file removal, substrate <br /> repair, tile replacement. <br /> <br /> B. Related Work in other sections, Section 07600 Flashing & Sheet Metal. <br /> <br />1.02 GENERAL REQUIREMENTS: <br /> <br /> A. Requirements of General and Supplementary conditions, Division 00 and Division 01 apply <br /> to all work in this section. <br /> <br /> B. Requirements of Section 02050 DEMOLITION apply to all work in this section. <br /> <br /> C. Applicator shall have a minimum of 5 years verifiable experience in the installation and/or <br /> rehabilitation of file roofing systems and shall exhibit a thorough knowledge of the <br /> technological aspects of historic tile roofing systems. <br /> <br />1.03 SUBMITTAL: <br /> <br /> A. Contzactor shall submit samples of roof file, manufacturer's descriptive literature and full <br /> technical and installation specifications for review and approval. Contractor shall prepare a <br /> 3'-0 x3'-0 field mock-up of file installation for inspection and approval of Constmedon <br /> Manager prior to proceeding with tile installation. <br /> <br />1.04 INSPECTION & SCHEDULING: <br /> <br /> A. Contractor shall submit inspection requests to Construction Manager following completion <br /> of the following work phases. Do not commence work on additional phases until <br /> <br /> Section 07200 <br /> Page 1-5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.