My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br /> inspection and approval of previously completed work by ConsU~ction Manager. Work <br /> phases requiring inspection are: <br /> <br /> Phase 1 Removal, sorting and on-site storage of existing roofing tile. <br /> Inspection and repair of roof substrate. <br /> Installation of roofing felt. <br /> <br /> Phase 2 Installation of flashing and roof accessories. <br /> Phase 3 Installation of salvaged original roofing tile and replica roofing tile. <br /> Phase 4 Flat tile substrate repair at dormers <br /> Phase 5 Tile replacement at dormers. <br /> <br /> B. Coordinate work of this Section with interfacing and adjoining work for proper sequencing <br /> of each installation. <br /> <br /> C. Do not schedule tile removal during forecasted periods of inclement weather. Provide <br /> adequate temporary waterproofing during periods of inclement weather. Insure best <br /> possible weather resistance and durability of the work and protection of materials and <br /> finishing. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 MATERIALS: <br /> <br /> A. Provide all materials necessary and incidental to the complete scope of work. <br /> <br /> B. Tile shall match existing historic roof file in composition, color, dimension, configuration <br /> and installation methodology. Tile shall be as custom manufactured by Ludowici Inc. to <br /> match existing historic tile. Acceptable distributors include JEH Company, 13910 RR Road <br /> 620 N, Austin, Texas 78729, 512-219-6226. <br /> <br /> C. Substrate: Repair or replace damaged substrate in-kind and as shown on Drawings. <br /> <br /> D. Roofing Felt: two layers of 30lb felt applied to all substrate surfaces. <br /> <br /> E. Battens: Existing wood battens shall be replaced with preservative treated wood battens of <br /> identical size, shape and configuration; as well as supplementary battens if required by <br /> Construction Manager. <br /> <br /> F. Tile Fasteners: Copper nails and wires shall be used throughout for general fastening of <br /> tiles to subs~ate. Provide copper tabs, "tingle" fasteners or copper wire/nail assemblies <br /> where required to secure tiles at all locations where tiles are cut and fitted at valleys and roof <br /> penetrations. <br /> <br /> G. Flashings: all existing flashing, gutters and downspouts, with exception of the leader boxes <br /> and downspouts at the Tower, shall be replaced, see Section 07600 Flashing & Sheet Metal. <br /> <br /> Section 07200 <br /> Page 2-5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.