My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Fris¢o Depot Rehabilitation O KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br /> C. Clean glass of window units promptly after installation: Wash and polish glass on both <br /> faces not more than 4 days prior to date scheduled for Final Inspection (of each <br /> area of project). Comply with glass manufacturer's recommendations for final <br /> cleaning and maintenance. <br /> <br /> D. Remove and replace glass which is broken, chipped, cracked, scratched, abraded or <br /> damaged in other ways during construction period, including natural causes, <br /> accidents and vandalism. <br /> <br /> E. Touch up and repair factory applied finish as required to provide a consistent visual <br /> appearance as required by the Architect. <br /> <br /> ** END OF SECTION ** <br /> <br /> Section 08610 <br /> Page 5-5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.