Laserfiche WebLink
Paris Santa Fe-Fris¢o Depot Rehabilitation © KI[YSTON[ AP. CHIT[C-'TS <br /> July 10, 2001 <br /> <br /> C. Set units level plumb and ;me to line and location. Adjust and reinfome the <br /> attachment substrate as necessary for proper installation and operation. <br /> <br /> D. Drill and countersink units which are not factory-prepared for anchorage fasteners. <br /> Space fasteners and anchors in accordance with industry standards. <br /> <br /> E. Installer shall be an experienced lock-smith, capable of providing full follow-up <br /> service after occupancy. Installer shall exercise the utmost care during installation of <br /> finish hardware. The cost of repairing damage to doors, cabinetxy and/or hardware <br /> caused by installer error shall be paid for by Contractor. <br /> <br />3.02 ADJUST AND CLEAN: <br /> <br /> A. Adjust and check each operating item of hardware and each door to ensure proper <br /> operation or function of every unit. Replace units which cannot be adjusted to <br /> operate freely and smoothly as intended for the application made. <br /> <br /> B. Final Adjustment: Wherever hardware installation is made more than one month prior <br /> to acceptance or occupancy of a space or area, return to the work during the week <br /> prior m acceptance or occupancy, whichever occurs later, and make final check and <br /> adjustment ofallhardwareitems in such space or area. Clean operating items as <br /> necessary to restore proper function and finish of hardware and doors. <br /> <br /> * * END OF SECTION * * <br /> <br /> Section 08710 <br /> Page 5-5 <br /> <br /> <br />