My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation O KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br /> 1. Wall Plaster <br /> All coats Gypsum/Sand Ration 1:3-4 <br /> <br /> 2. Ceiling Plaster <br /> Scratch Type "O" Mortar <br /> Brown/Finish Gypsum/Sand Ration 1:3-4 <br /> <br /> B. Lath: Existing basket-weave wood lathe shall be retained in all instances where it <br /> provides a stable, firmly attached substrate. In areas where plaster must be <br /> patched, new wood and metal lath is to be patched in with existing lath as per <br /> Drawings. <br /> <br /> C. Bonding Agents: Liquid plaster bonding agents compatible with existing and new <br /> plaster mixes. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 INSPECTION: <br /> <br /> A. Applicator must examine areas and conditions under which plaster work is to be <br /> applied and notify Construction Manager in writing of conditions detrimental to <br /> proper and timely completion of work. Do not proceed with work until <br /> unsatisfactory conditions have been corrected in a manner acceptable to <br /> Applicator. <br /> <br /> B. Starting of plaster work will be construed as Applicator's acceptance of surfaces <br /> and conditions within any particular area. <br /> <br /> C. Do not apply plaster over soft plaster, soft or flaking brick masonry, dirt, rust, <br /> scale, grease, moisture or other conditions detrimental to formation of a durable <br /> and aesthetically superior plaster finish. <br /> <br /> Section 09910 <br /> <br /> Page 3-7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.